- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
zozen
-
Dimension(L*W*H):
-
7200*3250*3900mm
-
Weight:
-
24.5Ton
-
Product name:
-
Thermal Oil Boiler
-
Product thermal capacity:
-
700-14000 KW
-
Working pressure:
-
0.8-1.0 MPA
-
Outlet temperature:
-
320 °C
-
Application:
-
Petroleum, chemical, chemical fiber,
-
Feature:
-
National Designed A-class Boiler
-
Design fuel:
-
natural gas, coke oven gas, bio-gas
-
Operation:
-
Automatic Operation
-
Color:
-
Customer's Requirement
-
Quality:
-
100% Tested
Quick Details
-
Core Components:
-
coiler
-
Steam Production:
-
none
-
Place of Origin:
-
Jiangsu, China
-
Brand Name:
-
zozen
-
Dimension(L*W*H):
-
7200*3250*3900mm
-
Weight:
-
24.5Ton
-
Product name:
-
Thermal Oil Boiler
-
Product thermal capacity:
-
700-14000 KW
-
Working pressure:
-
0.8-1.0 MPA
-
Outlet temperature:
-
320 °C
-
Application:
-
Petroleum, chemical, chemical fiber,
-
Feature:
-
National Designed A-class Boiler
-
Design fuel:
-
natural gas, coke oven gas, bio-gas
-
Operation:
-
Automatic Operation
-
Color:
-
Customer's Requirement
-
Quality:
-
100% Tested
YQW series gas-fired thermal oil boilers have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.
This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).
FEATURE:Low pressure and high temperature
Thermal efficiency above 95%
Fully automatically safe operation
MODEL: YY(Q)W(L)
FUEL: Natural gas, coke oven gas, LPG, diesel, heavy oil, light oil, etc
TEMPERATURE:320℃
CAPACITY: 0.7-29 MW (0.8-1.0MPa)



Model
|
Rated thermal power (KW)
|
Rated thermal power (x104kcal/h)
|
Design working temperature(≤℃)
|
Rated working pressure(MPa)
|
Thermal efficiency (≥%)
|
System installation power(KW)
|
YQW-700Q
|
700
|
60
|
320
|
0.8
|
88
|
18
|
YQW-1000Q
|
1000
|
80
|
320
|
0.8
|
88
|
18
|
YQW-1200 Y(Q)
|
1200
|
100
|
320
|
0.8
|
88
|
35
|
YQW-1400 Y(Q)
|
1400
|
120
|
320
|
0.8
|
88
|
35
|
YQW-1800 Y(Q)
|
1800
|
160
|
320
|
0.8
|
90
|
56
|
YQW-2400 Y(Q)
|
2400
|
200
|
320
|
0.8
|
90
|
56
|
YQW-2800 Y(Q)
|
2800
|
240
|
320
|
0.8
|
90
|
66
|
YQW-3500 Y(Q)
|
3500
|
300
|
320
|
0.8
|
90
|
75
|
YQW-4200Q
|
4200
|
360
|
320
|
0.8
|
90
|
95
|
YQW-4600Q
|
4600
|
400
|
320
|
0.8
|
90
|
95
|
YQW-6000Q
|
6000
|
500
|
320
|
0.8
|
90
|
140
|
YQW-7000Q
|
7000
|
600
|
320
|
0.8
|
90
|
140
|
YQW-8200Q
|
8200
|
700
|
320
|
0.8
|
90
|
140
|
YQW-9400Q
|
9400
|
800
|
320
|
1
|
90
|
200
|
YQW-10500Q
|
10500
|
900
|
320
|
1
|
90
|
200
|
YQW-12000Q
|
12000
|
1000
|
320
|
1
|
90
|
240
|
YQW-14000Q
|
14000
|
1200
|
320
|
1
|
90
|
300
|

1. How can you get the best price quickly?
(1) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
(2) Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
2. Why should you believe our boiler quality?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler;
(4).Hydrostatic test: ensure the standard working pressure and safety;
(5).Third-party inspection report:By Jiangsu Boiler Inspection Institute;
(6).Passed ISO:9001 ,ISO14001,OHASA18001 and ASME(S and U) and A-class boiler certificate.
3. Quality warrantee
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed 18 months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
4. Quality warrantee
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed 18 months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
5.Terms of payment
T/T 30% of total contract value as down payment;
T/T or L/C 70% of total contract value before delivery.
6.Claim
Any claims by the buyers regarding the machines shipped should be filed within 30 days after arrival of machines at the destination specified in the relative B/L and supported by a survey report issued by a surveyor approved by the sellers, otherwise the sellers shall refuse to consider. Claims in respect of matters within responsibility of insurance company and/or shipping company will not be considered by the seller.
7. What is the using life of your boiler?
A:Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,the boiler can be used for 20-25 years.