Products
Hot Sale Silicone Rubber Wristband Making Machine
Hot Sale Silicone Rubber Wristband Making Machine
Hot Sale Silicone Rubber Wristband Making Machine
Hot Sale Silicone Rubber Wristband Making Machine
Hot Sale Silicone Rubber Wristband Making Machine
Hot Sale Silicone Rubber Wristband Making Machine
Hot Sale Silicone Rubber Wristband Making Machine
Hot Sale Silicone Rubber Wristband Making Machine

Hot Sale Silicone Rubber Wristband Making Machine

FOB Reference Price: Get Latest Price
≥1 Sets
US $5000
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Weight:
2000
Service:
Customized
Automatic grade:
Automatic
Structure:
Column
Heating mode:
Electric
Rubber machine:
Video technical support
After Warranty Service:
Field maintenance and repair service
Certification:
CE,ISO,SGS

Quick Details

Place of Origin:
Shandong, China
Brand Name:
SFC
Voltage:
As your requirement
Weight:
2000
Service:
Customized
Automatic grade:
Automatic
Structure:
Column
Heating mode:
Electric
Rubber machine:
Video technical support
After Warranty Service:
Field maintenance and repair service
Certification:
CE,ISO,SGS

Hot Sale Silicone Rubber Wristband Making Machine

Product Description

1. The Rubber Wristband Making Machine is composed of press plate, up and down platform, piston stroke, hydro-cylinder, hydraulic station and pillar column.
2. The hot plates are obtained by 35# steel plates after normalizing handling and then adopting double scale rolling.
3. Up and down platforms adopts Q235 steel plates. In order to guarantee the make precision, it is applied with automatic cutting baiting, mechanical slicer producing welded groove, carbon dioxide gas shielded welding. It all adopts alloy welding wire welding and after welding takes whole enter into stove to go on the hot treatment to remove the welding stress exhaustively. And then go on mechanical producing to guarantee it won't become deformed.
4. The cylinder's material is QT500-7 and HT200 for piston. Moreover, we can also manufacture the cylinder with ZG270-500 material and piston with cold hard chilled alloy cast iron.
5. And sealing structure applies the combined structure with double sealing ring and one dustproof ring to guarantee longer service. The piston rise and fall under the working hydraulic pressure. When the piston fall(plates starting to work) depending on the weight of the plates, platform and piston to drive the hydraulic oil flowing back oil stock container to realize falling purpose.
6. The assembled oil pump is the source of power of press which supplies working oil with certain pressure. The oil enter into cylinder through controlling valve and move the hand shank to different places to realize the rising and falling of the piston.
7. The electrical controlling system adopts automatic and semi-automatic controlling method. When adopting automatic controlling way, it can be switched into manual control.

Parameters

We can design various rubber wristband making machine according to your requirements.

Model

Total Pressure

Daylight

(mm)

Working

Layer

Piston

Stroke(mm)

Main Motor

Power(KW)

Overall Diameter

(LxWxH)(mm)

XLB-350x350x2

0.25

125

2

250

2.2

1200x580x1200

XLB-400x400x2

0.50

125

2

250

2.2

1400x500x1400

XLB-600x600x2

1.00

125

2

250

2.2

1880x820x1680

XLB-750x850x4

1.60

125

4

500

3

1730x930x2460

XLB-900x900x2

2.5

200

2

400

4

2345x960x1385

XLB-1200x1200x1

3.15

300

1

300

4

2800x1300x2300

XLB-1300x2000x1

5.60

400

1

400

8

2000x1860x2500

XLB-1500x1500x1

8.00

800

1

800

16.5

2200x2200x4300

XLB-1500x2500x1

15.00

400

1

400

11

3000x2500x3300

XLB-2000x2000x1

20.00

400

1

400

11

3600x3000x3300

Packaging & Shipping

Our Services

1,Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
2,In the process of production, we will take photos and send to customers for their track the progress.
3,Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
4,We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
5,We supply overseas engineer service and help to train your workers to operate the machine.

FAQ

1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.

2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.

3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.

4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.

5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.

6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.

Welcome to your inquiry!

APP
Post My RFQ
WhatsApp
+86-17326049340