- Product Details
- {{item.text}}
Quick Details
-
Power:
-
230kw
-
Place of Origin:
-
Beijing, China
-
Machine Weight:
-
9600 kg
-
Product name:
-
Excavator
-
Brand Name:
-
SANY
-
Keywords:
-
Mining excavator
-
Model Number:
-
SY155H
-
Color:
-
Black
-
Rate Power:
-
84
-
Engine:
-
Optional
-
Work Speed:
-
3-6m/min
-
Key words:
-
Advantage
Quick Details
-
Operating Weight:
-
400 Ton, 90 Ton, 300 Ton, Other
-
Bucket capacity:
-
8m³
-
Engine Brand:
-
HINO
-
Power:
-
230kw
-
Place of Origin:
-
Beijing, China
-
Machine Weight:
-
9600 kg
-
Product name:
-
Excavator
-
Brand Name:
-
SANY
-
Keywords:
-
Mining excavator
-
Model Number:
-
SY155H
-
Color:
-
Black
-
Rate Power:
-
84
-
Engine:
-
Optional
-
Work Speed:
-
3-6m/min
-
Key words:
-
Advantage
Product Description
![](https://cdn.bestsuppliers.com/seo_products_img/jncjconstructionmachinery/6ab24b0406ef3250b5929f2eeb420d56.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/jncjconstructionmachinery/3b2244da35c63baabb97ecf38ec03e3d.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/jncjconstructionmachinery/6bd00e8cacff374d892df0ccf8d6e7a8.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/jncjconstructionmachinery/53f78c9d82ca3e7aa59fd753575bcf32.jpg!/rotate/180)
Specification
Brand
|
SANY
|
Model number
|
SY415H
|
Weight (t)
|
41.5
|
Bucket maximum digging force (KN)
|
247
|
Maximum digging radius (mm)
|
10920
|
Bucket capacity (m³)
|
2.2
|
Engine brand
|
ISUZU
|
Engine type
|
6UZ1
|
Engine power (kw)
|
257
|
Rotation speed (r/min)
|
8.3
|
Travel speed (km/h)
|
5.5/3.2
|
Length (mm)
|
11700
|
Width (mm)
|
3360
|
Height (mm)
|
3740
|
Attachment
Spare parts
Similar Products
Buying guides
Packing & Delivery
Service
FAQ
Q1:What types of currency are accepted?
A:Mostly currencies are acceptable, such as USD, EUR, JPY.
Q2:What kind terms of payment can be accepted?
A:Normally we can work on T/T term or L/C term, sometime DP term.
(1) On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment, or against the copy of
original B/L for long-term cooperating client.
(2) On L/C term, a 100% irrevocable L/C without "soft clauses" from an international recognized bank can be accepted. Please seek
the advice from the individual sales manager whom you work with.
Q3:Which Incoterms 2010 can we work?
A:We can handle all INCOTERMS 2010 terms, and we normally work on regular terms such as FOB, CFR, CIF, CIP, DAP.
Q4:How do I make sure that the goods are dispatched on time after payment?
A: We will ask you to visit our factory, and we can also provide you with photos of the goods being shipped.
Q5:What is the shipping time after dispatch ?
A:The shipping time for each region is as follows:
Southeast Asia: 7-10 days to the port; Middle East: 15-25 days;
East Africa: about 25 days; South Africa: 20-40 days;
West Africa: about 45 days; Europe: 30-40 days;
North America: 12-17 days; South America: 25-30 days.
A:Mostly currencies are acceptable, such as USD, EUR, JPY.
Q2:What kind terms of payment can be accepted?
A:Normally we can work on T/T term or L/C term, sometime DP term.
(1) On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment, or against the copy of
original B/L for long-term cooperating client.
(2) On L/C term, a 100% irrevocable L/C without "soft clauses" from an international recognized bank can be accepted. Please seek
the advice from the individual sales manager whom you work with.
Q3:Which Incoterms 2010 can we work?
A:We can handle all INCOTERMS 2010 terms, and we normally work on regular terms such as FOB, CFR, CIF, CIP, DAP.
Q4:How do I make sure that the goods are dispatched on time after payment?
A: We will ask you to visit our factory, and we can also provide you with photos of the goods being shipped.
Q5:What is the shipping time after dispatch ?
A:The shipping time for each region is as follows:
Southeast Asia: 7-10 days to the port; Middle East: 15-25 days;
East Africa: about 25 days; South Africa: 20-40 days;
West Africa: about 45 days; Europe: 30-40 days;
North America: 12-17 days; South America: 25-30 days.
Hot Searches