- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
No
-
Product name:
-
Hot Sale Best Durable Cnc Tools Die For Press Brake
-
Product Type:
-
press brake die holder
-
Hardness:
-
HRC47+/-2
-
Forming Mode:
-
Forging Mould
-
Delivery Time:
-
7-20 Days
-
Size:
-
Customized Size
-
Place Of Orign:
-
Maanshan,China
-
Key word:
-
bending machine
Quick Details
-
Shaping Mode:
-
Forging Mould
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
Golin, Golin
-
Model Number:
-
No
-
Product name:
-
Hot Sale Best Durable Cnc Tools Die For Press Brake
-
Product Type:
-
press brake die holder
-
Hardness:
-
HRC47+/-2
-
Forming Mode:
-
Forging Mould
-
Delivery Time:
-
7-20 Days
-
Size:
-
Customized Size
-
Place Of Orign:
-
Maanshan,China
-
Key word:
-
bending machine
Hot Sale Best Durable Cnc Tools Die For Press Brake
LOWER DIE PRODUCTS
SIZE
The true standard length of the national diamond Cnc Tools Die For Press Brakes cnc press brake tooling die is:
Two kinds of L835mm and S415mm. According to the length of the Cnc Tools Die For Press Brakes cnc press brake tooling machine worktable, it is used in combination.
The standard segmentation size is:
Lower model:10,15,20,40,50,100,200,400=835mm (set)
COMBINED REFERENCE TABLE
ABOUT US
OUR STRENGTH
OUR CERTIFICATE
SHIPPING
Shipping Method |
Quantity |
Means Of Transport |
Shipping Time |
Origin And Destination |
Express |
Suit for small order and sample order |
DHL Fedex EMS UPS |
3-10 days |
Door to door |
Air Transportation |
Suit for middle order such as:200-1000 pcs |
By Plane |
5-15 days |
Airport to airport |
Sea Trasnsprtation |
Suit for big order such as: over 1000 pcs |
By Ship |
15-30 days |
Seaport to seaport |
FAQ
1. Q: Are you a factory or trading company? How is you factory extrusion experience?
A: We are a factory. 15 years Manufacturing experience.Leading supplier in Maanshan city.
2. Q:Can you put my brand logo on these products?
A:Yes we can.
3. Q:What is the Minimum Order Quantity (MOQ) for your OEM service?
A:MOQ is 1pcs.
4. Q:When can you ship the products after we make payment?
A:Production time is normally 15-25 days.