- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
Surealong
-
Model Number:
-
swivel caster wheel
-
Product name:
-
6 Inch Sliding Gate Casters for Wooden Gate Metal Fence
-
Material:
-
Metal and Rubber
-
Surface Treatment:
-
Zinc plated
-
Wheel diameter:
-
4inch/6inch/8inch
-
Feature:
-
Universal Caster Wheel/durable/anti-corrosion
-
Function:
-
Caster Moving
-
Load Capacity:
-
200 pounds
-
Certificate:
-
ISO Rosh CE
-
Mounting Type:
-
Stem Mount
-
Package:
-
Brown Box
Quick Details
-
Application:
-
Kitchen, Home Office, Outdoor, Hotel, Apartment, Office Building, Hospital, School, Mall, Sports Venues, Leisure Facilities, Supermarket, Warehouse, Workshop, Park, Farmhouse, Courtyard, Storage & Closet, Exterior, Hall, Home Bar, Basement, Garage & Shed, Gym, Laundry, Villa, Garden Gate Caster Wheel
-
Design Style:
-
Industrial
-
Place of Origin:
-
Beijing, China
-
Brand Name:
-
Surealong
-
Model Number:
-
swivel caster wheel
-
Product name:
-
6 Inch Sliding Gate Casters for Wooden Gate Metal Fence
-
Material:
-
Metal and Rubber
-
Surface Treatment:
-
Zinc plated
-
Wheel diameter:
-
4inch/6inch/8inch
-
Feature:
-
Universal Caster Wheel/durable/anti-corrosion
-
Function:
-
Caster Moving
-
Load Capacity:
-
200 pounds
-
Certificate:
-
ISO Rosh CE
-
Mounting Type:
-
Stem Mount
-
Package:
-
Brown Box
Rolling Gate Wheels 6 Inch Sliding Gate Casters for Wooden Gate Metal Fence
DURABLE STEEL CONSTRUCTION allows gates to freely open and close, while preventing the gate from dragging on the ground.
STAINLESS STEEL CARRIER absorbs shock and reduces wear on gate and hinges, extending the life of your gate.
DUAL 6 INCH HARD RUBBER WHEELS with 7 inch axle comes with adjustable Steel U-Bolts for Mounting, and fits round tube gates measuring 1-3/8 to 1-7/8 inch metal pipe.
UNIVERSAL MOUNTING SYSTEM designed to be mounted on metal pole and chain link fence gates. STOPS GATE SAGGING and allows for easy opening and closing.
Products Description
Details Images
Application
Package & Delivery
Payment
We can accept different payment methods: T/T, L/C, Paypal, Western Union, Escrow, Alipay. It's negotiable
Delivery
1. Express Air Shipping, DHL/TNT/UPS/FedEx, 5-7 Days;
2. Sea Shipping, 20-30 Days. DDP Service is Acceptable;
3. Shipping by Railway/Truck.
Our Factory
Not Just a Supplier, but a Valued Business Partner
Surealong Group Corporation
specialize in
Brackets&Racks, including Shelf Brackets, Heavy-duty Brackets, Countertop Brackets, Pipe Bracketsm Garden Brackets, Bed Rail Brackets, Timber Connect Brackets, Swing Brackets, Cable Support Brackets, Bike Racks, Power Tools Racks, Display Racks, Ceiling Racks Firewood Racks, Lumber Storage Racks
and so on.
Established in 2007, Surealong is a precise, quality driven manufacturer with the highest attention to ISO 9001:2015 standards. Our company occupies a 200 square foot modern building. We are located 30 minutes South of Chinese Tianjin Port.
As a medium-sized company, we have the flexibility in tooling development and production organization upon the request of diversified and prompt delivery.
Major Customer Current: We have cooperated with ABB\Panasonic\STANLEY and SARTORIUS smoothly.
One-on-One Service Help
Custom or not, each project deserves individual attention. Our sales consultants provide help with choosing style, size, color, package or shipping!
If you have any question, please feel free to contact us!
sale@surealong.com
FAQ
-Who we are?
Surealong a global
MANUFACTURER
of precision metal stampings and complex assemblies. We provide turnkey services, from design, tooling development, and sourcing to stamping, finishing, assembly, packaging, and shipping even the support after delivery.
-Can you help me design metal stamping prototypes?
Surealong offers engineering and prototyping services to help you turn your stamped metal part designs into reality.
-What kind of surface finishing you can do?
zinc/chrom/nickel plating,
powder coating,painting,
anodizing,sandblasting.polishing,brushing
-Do you provide samples? is it free or extra?
Yes, we could supply free sampes.
-How long do the sample and mass production take?
5-7 days for sample production, 10-20 days for mass production.
-What's your payment term?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Hot Searches