- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
Jingcheng
-
Model Number:
-
WD-FP
-
Surface Treatment:
-
smooth
-
Raw material:
-
Resin and fiberglass
-
Resin:
-
ORT/ISO/VINYL
-
Certificate:
-
ISO9001
-
Color:
-
Optional
Quick Details
-
Application:
-
Industry,construction
-
Technique:
-
Pultrusion
-
Place of Origin:
-
Zhejiang, China
-
Brand Name:
-
Jingcheng
-
Model Number:
-
WD-FP
-
Surface Treatment:
-
smooth
-
Raw material:
-
Resin and fiberglass
-
Resin:
-
ORT/ISO/VINYL
-
Certificate:
-
ISO9001
-
Color:
-
Optional
Item |
Size ( mm ) |
Weight ( kg/m ) |
||
Height |
Wideth |
Thickness |
||
Rectangular tube |
50 |
50 |
3.5 |
1.204 |
50 |
50 |
4.0 |
1.362 |
|
50 |
50 |
5.0 |
1.665 |
|
100 |
50 |
5 |
2.59 |
|
100 |
100 |
6 |
4.173 |
|
I beam |
200 |
100 |
10 |
7.030 |
150 |
100 |
10 |
6.105 |
|
100 |
50 |
8 |
2.723 |
|
Channel beam |
200 |
60 |
10 |
5.55 |
175 |
75 |
7 |
4.03 |
|
152 |
43 |
9.5 |
3.85 |
|
60 |
50 |
5 |
1.388 |
|
50 |
30 |
5 |
0.925 |
|
87 |
30 |
5 |
0.983 |
|
Angle beam |
40 |
40 |
4 |
0.56 |
50 |
50 |
5 |
0.88 |
|
Round tube |
Outside Dia. |
Thickness |
||
28.6 |
5.0 |
0.69 |
||
32 |
3.0 |
0.506 |
||
32 |
6.75 |
0.99 |
||
36 |
5.0 |
0.900 |
||
45 |
6.75 |
1.50 |
||
50 |
3.0 |
0.82 |
||
50 |
4.0 |
1.07 |
||
50 |
5.0 |
1.308 |
||
Wintersweet tube |
32 |
5.0 |
0.558 |
|
FRP rod |
10 |
0.176 |
||
20 |
0.67 |
|||
30 |
1.5 |
|||
Baseboard panel |
100 |
3.0 |
0.722 |
Remark:
we can produce all the different types FRP pultrusion profile according customer requirement and drawings.
The explaination of pultrusion technique:
During the pultrusion process,the raw material are pulled through a heated steel forming die using a continuous pulling device. when the reinforcements are saturated with the resin mixture in the resin bath and the wetted reinforcement package is wrapped in a surfacing veil. the completed package then goes into a performer that roughly forms the package into the appropriate shape to enter the heated die for curing. the die is the exact shape of the final part desired. upon exiting the die, the part is over 90% cured and solid. the length of the part required is pulled through the cutoff saw and the process is complete.