Products
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton
Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton

Pavement Road Fill Asphalt Patch High Performance Cold Mix Bitumen Price Per Ton

FOB Reference Price: Get Latest Price
≥84 Tons
US $170
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Brand Name:
OEM available
Model Number:
Plasticizing quick-setting type
Softening Point:
-
Product Name:
Road Patch
Application:
Roads
Color:
Black
Package:
25 kgs/pp woven bag
Appearance:
Normal Temperature
Suit for weather:
All-weather
Cost:
Save Cost

Quick Details

Type:
Petroleum Asphalt
Grade:
General Type/Plasticizing quick-setting type
Place of Origin:
China
Brand Name:
OEM available
Model Number:
Plasticizing quick-setting type
Softening Point:
-
Product Name:
Road Patch
Application:
Roads
Color:
Black
Package:
25 kgs/pp woven bag
Appearance:
Normal Temperature
Suit for weather:
All-weather
Cost:
Save Cost

Pavement Road Fill Asphalt Patch

High Performance Cold Mix Bitumen Price Per Ton

1.Construction Technology

Pothole Cleaning

Clean up the gravel and waste residue in and around the pit to be repaired. There should be no mud, ice cubes and other debris in the pit. The pit to be repaired should have neatly cut edges, and solids should be seen in the removal of waste residue. until the firm side.

Brush interface edge sealer

Evenly brush the interface agent on the facade and bottom of the cleaned pit, especially around the pit and the corners of the pit, and evenly.

Fill the Pit

After opening the bag, fill enough asphalt cold patch material into the pothole until the filler is about 1.5cm higher than the road surface. After filling, the center of the pothole should be slightly higher than the surrounding road surface and be curved. If the depth of the road pothole is greater than 5cm When filling, it should be filled in layers and compacted layer by layer, and each layer should be 3-5cm.

Compaction

After laying evenly, according to the field environment, the size and depth of the repaired area, select appropriate compaction tools and methods for compaction. Such as human compaction, vibrating plate compactor, and road roller compaction. When repairing high-grade and high-traffic highways, the surrounding areas and corners of the repaired area should be fully compacted, and there must be no shortage of materials and virtual paving. Otherwise, looseness and water seepage may occur due to insufficient compaction.

Open to Traffic

After compaction, it can be directly opened to traffic.

2.Ordinary asphalt cold patch

Long time to fully cure: 5-7 days

Validity: 2 years

The formula should be used seasonally

3.Execution Standard Report

Execution Standard: JT/T-2015

(National Standard for Testing Asphalt Cold Feed Finished Products)

Item Technical Request Result Judgment
Adhesion grade Pass
Penetration strength (kg/cm2) 0.5-4 2.5 Pass
Stability(kN) ≥3 5.2 Pass
Residual stability ≥85 87 Pass

We testify that the chemical analysis shown hereunder for these goods have been duly tested by us and we confirm that the goods are in compliance with approved national standards.

About Product

APP
Post My RFQ
WhatsApp
+86-17326049340