- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
OEM available
-
Model Number:
-
Plasticizing quick-setting type
-
Softening Point:
-
-
-
Product Name:
-
Road Patch
-
Application:
-
Roads
-
Color:
-
Black
-
Package:
-
25 kgs/pp woven bag
-
Appearance:
-
Normal Temperature
-
Suit for weather:
-
All-weather
-
Cost:
-
Save Cost
Quick Details
-
Type:
-
Petroleum Asphalt
-
Grade:
-
General Type/Plasticizing quick-setting type
-
Place of Origin:
-
China
-
Brand Name:
-
OEM available
-
Model Number:
-
Plasticizing quick-setting type
-
Softening Point:
-
-
-
Product Name:
-
Road Patch
-
Application:
-
Roads
-
Color:
-
Black
-
Package:
-
25 kgs/pp woven bag
-
Appearance:
-
Normal Temperature
-
Suit for weather:
-
All-weather
-
Cost:
-
Save Cost
Pavement Road Fill Asphalt Patch
High Performance Cold Mix Bitumen Price Per Ton
1.Construction Technology
Pothole Cleaning
Clean up the gravel and waste residue in and around the pit to be repaired. There should be no mud, ice cubes and other debris in the pit. The pit to be repaired should have neatly cut edges, and solids should be seen in the removal of waste residue. until the firm side.
Brush interface edge sealer
Evenly brush the interface agent on the facade and bottom of the cleaned pit, especially around the pit and the corners of the pit, and evenly.
Fill the Pit
After opening the bag, fill enough asphalt cold patch material into the pothole until the filler is about 1.5cm higher than the road surface. After filling, the center of the pothole should be slightly higher than the surrounding road surface and be curved. If the depth of the road pothole is greater than 5cm When filling, it should be filled in layers and compacted layer by layer, and each layer should be 3-5cm.
Compaction
After laying evenly, according to the field environment, the size and depth of the repaired area, select appropriate compaction tools and methods for compaction. Such as human compaction, vibrating plate compactor, and road roller compaction. When repairing high-grade and high-traffic highways, the surrounding areas and corners of the repaired area should be fully compacted, and there must be no shortage of materials and virtual paving. Otherwise, looseness and water seepage may occur due to insufficient compaction.
Open to Traffic
After compaction, it can be directly opened to traffic.
2.Ordinary asphalt cold patch
Long time to fully cure: 5-7 days
Validity: 2 years
The formula should be used seasonally
3.Execution Standard Report
Execution Standard: JT/T-2015 (National Standard for Testing Asphalt Cold Feed Finished Products) |
|||
Item | Technical Request | Result | Judgment |
Adhesion grade | 5° | 5° | Pass |
Penetration strength (kg/cm2) | 0.5-4 | 2.5 | Pass |
Stability(kN) | ≥3 | 5.2 | Pass |
Residual stability | ≥85 | 87 | Pass |