- Product Details
- {{item.text}}
Quick Details
-
Application:
-
Hotel
-
Design Style:
-
Modern
-
Place of Origin:
-
Shanghai, China
-
Brand Name:
-
XZIC
-
Model Number:
-
Wooden soundproof Door
-
Certificate:
-
UL, BS, EN
-
Hardware:
-
Chinese Top Brand
-
Color:
-
Customized
-
Surface treatment:
-
Powder Coated
-
Size:
-
Customized Size
-
Function:
-
Noise Insulation
-
HS code:
-
7308300000
-
Delivery Time:
-
15-20days
Quick Details
-
Door Material:
-
Wood
-
Feature:
-
Sound Insulation
-
Main Material:
-
Solid Wood
-
Application:
-
Hotel
-
Design Style:
-
Modern
-
Place of Origin:
-
Shanghai, China
-
Brand Name:
-
XZIC
-
Model Number:
-
Wooden soundproof Door
-
Certificate:
-
UL, BS, EN
-
Hardware:
-
Chinese Top Brand
-
Color:
-
Customized
-
Surface treatment:
-
Powder Coated
-
Size:
-
Customized Size
-
Function:
-
Noise Insulation
-
HS code:
-
7308300000
-
Delivery Time:
-
15-20days
ul listed soundproof door interior soundproof wood door soundproof wooden door for apartment
Products name | Studio soundproof noise insulation door |
Coefficient of sound insulation | 35-42DB |
Heat preservation coefficient | 1.8~2.2W/m.k |
Door leaf thickness | 0.8mm /1.0mm galvanized steel sheet/ solid wood |
Door leaf steel plate thickness | 120mm |
Door frame steel plate Width | 1.2mm / 1.5mm galvanized steel sheet / solid wood |
Filler | S ound insulation and heat insulation cotton |
Hardware | Lock,handle,hinges,door stopper,and others as request. |
Air tank | Double air tank |
Application | Suit for movie theater, recording studio, KTV,etc. |
Q1: Are you a manufacturer of fire doors?
A:Yes ,we are. Offering excellent and various goods at competitive price is what we have been keeping doing.
Q2: What kind of Certification did you pass?
A: After relevant institution of professional evaluation, we're qualified for UL, CE, ISO9001, BV, ROHS, etc.
For wooden fire doors, we are qualified for BS-476, EN-1634, UL-10C.
Q3: How can you guarantee your final quality?
A: As for quality control, we've approved four testing procedures:
Initial inspection, re-inspection, final inspection and sampling inspection.
Q4: How is the MOQ of required?
A: We welcome any amount under your requested. but a competitive price is always depends on the quantity increase gradually.
Q5: How long is the production lead time?
A: Usually, T/T 50% deposit to start production, the balance paid before shipping. Lead time about 15-25 days.