- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Shanghai, China
-
Brand Name:
-
Jindun, Jiahui, Tomson, Chuangan,etc
-
Certificate:
-
ISO,CE,GMC,SGS ,ROHS
-
Material:
-
Galvanized Steel
-
Hardware:
-
Chinese Top Brand
-
Color:
-
Customized Colors
-
Opening direction:
-
Outward Opening(right
-
Size:
-
Customized Size
-
Accessories:
-
Lock+handles+hinge
-
Advantage:
-
Acoustic Insulation
-
Type:
-
Entry Doors
Quick Details
-
Door Material:
-
Steel
-
Application:
-
Hotel
-
Design Style:
-
Modern
-
Place of Origin:
-
Shanghai, China
-
Brand Name:
-
Jindun, Jiahui, Tomson, Chuangan,etc
-
Certificate:
-
ISO,CE,GMC,SGS ,ROHS
-
Material:
-
Galvanized Steel
-
Hardware:
-
Chinese Top Brand
-
Color:
-
Customized Colors
-
Opening direction:
-
Outward Opening(right
-
Size:
-
Customized Size
-
Accessories:
-
Lock+handles+hinge
-
Advantage:
-
Acoustic Insulation
-
Type:
-
Entry Doors
Products name | Studio soundproof noise insulation door |
Coefficient of sound insulation | 42DB |
Heat preservation coefficient | 1.8~2.2W/m.k |
Door leaf thickness | 0.8mm /1.0mm galvanized steel sheet |
Door leaf steel plate thickness | 120mm |
Door frame steel plate Width | 1.2mm / 1.5mm galvanized steel sheet |
Filler | S ound insulation and heat insulation cotton |
Hardware | Lock,handle,hinges,door stopper,and others as request. |
Air tank | Double air tank |
Application | Suit for movie theater, recording studio, KTV,etc. |
Q1: Are you a manufacturer of fire doors?
A:Yes ,we are. Offering excellent and various goods at competitive price is what we have been keeping doing.
Q2: What kind of Certification did you pass?
A: After relevant institution of professional evaluation, we're qualified for UL, CE, ISO9001, BV, ROHS, etc.
For wooden fire doors, we are qualified for BS-476, EN-1634, UL-10C.
Q3: How can you guarantee your final quality?
A: As for quality control, we've approved four testing procedures:
Initial inspection, re-inspection, final inspection and sampling inspection.
Q4: How is the MOQ of required?
A: We welcome any amount under your requested. but a competitive price is always depends on the quantity increase gradually.
Q5: How long is the production lead time?
A: Usually, T/T 50% deposit to start production, the balance paid before shipping. Lead time about 15-25 days.