- Product Details
- {{item.text}}
Quick Details
-
Weight:
-
7600 KG
-
Drilling Diameter:
-
305mm
-
Drilling Depth:
-
Max.280m
-
Product name:
-
FY280 Water well drilling rig
-
Certification:
-
CE
-
Character:
-
steeltrack drillling tower:6.6m
-
Color:
-
Blue
-
Drill pipe diameter:
-
76/89mm
-
Drill pipe length:
-
1.5m 2m 3m
-
After-sales Service Provided:
-
Online Support
-
Application:
-
Water Wells Rock Drill Rig
-
Air consumption:
-
17-31m3/min
-
Swing torque:
-
4500-6000N.m
Quick Details
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
FeiDa Machinery
-
Dimension(L*W*H):
-
5900*1800*2450mm
-
Weight:
-
7600 KG
-
Drilling Diameter:
-
305mm
-
Drilling Depth:
-
Max.280m
-
Product name:
-
FY280 Water well drilling rig
-
Certification:
-
CE
-
Character:
-
steeltrack drillling tower:6.6m
-
Color:
-
Blue
-
Drill pipe diameter:
-
76/89mm
-
Drill pipe length:
-
1.5m 2m 3m
-
After-sales Service Provided:
-
Online Support
-
Application:
-
Water Wells Rock Drill Rig
-
Air consumption:
-
17-31m3/min
-
Swing torque:
-
4500-6000N.m
Product Description
Water well drilling rig specifications

Parameter / Model
|
FY280
|
The weight (T)
|
7.6
|
The hole diameter (mm)
|
140-305
|
Drilling depth (m)
|
280
|
One-time advance length (m)
|
6.6
|
Walking speed (km/h)
|
2.5
|
Climbing angles (Max.)
|
30
|
Equipped capacitor (KW)
|
75
|
Using air pressure (MPA)
|
1.7-3.0
|
Air consumption (m3/min)
|
17-31
|
Drill pipe diameter (mm)
|
Φ76 Φ89
|
Drill pipe length (m)
|
1.5m 2.0m 3.0m 6.0m
|
Rig lifting force (T)
|
17
|
Swing speed (rpm)
|
40-70
|
Swing torque (N.m)
|
4300-5500
|
Dimension (mm)
|
5900*1800*2450
|



Application
The following images are from customer feedback,We also have a lot of customer feedback videos, if you are interested, contact us
Work Flow
Step1:
cutting material
Step 2:
machine work
Step 3:
engine assembly
Step 4:
Assembly and welding Step 5:Installation of hydraulic valve
Step 6:
Tubing connection
Step 7:
The machine is finished and tested
Packing & Delivery
Hot Searches