Products
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas
Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas

Oven 3 Hob Gas Accessories Fire Pit Outdoor Furnace Burner High Temperature Industrial Teppan U-shaped Stove Gas

FOB Reference Price: Get Latest Price
≥100 Pieces
US $10
≥500 Pieces
US $1
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Place of Origin:
Zhejiang, China
Brand Name:
NO
No. of Electric Burner:
1
No. of Gas Burner:
1

Quick Details

Warranty:
1 Year
Type:
Gas Cooktops
Application:
Hotel, Outdoor, RV, Household
Place of Origin:
Zhejiang, China
Brand Name:
NO
No. of Electric Burner:
1
No. of Gas Burner:
1
Name:
Stainless steel U shape gas burner for bbq
Place of origin
Zhejiang, China
Power
2~12KW (1.896~11.374Btu/s)
Application
Gas heater, gas water heater, gas grill, gas stove, gas cooker
Size
Ø20~Ø60
Packing
carton, pallet
Length
Customized
MOQ
1000 PCS
Q1:What certification has your company passed?
A : Our company has passed the ISO 9000 certification, SGS certification.

Q2:How long is the mold development cycle?
A :It's usually 30 to 60 days.

Q3 :How long is the service life of the mold?
A :50,000 to 100,000 modules.

Q4 :Does the facility provide OEM and ODM services?
A :Yes.

Q5:What are the ways of surface treatment in the factory?
A :Electroplating, shot blasting, electrolysis, spraying, oxidation, passivation, PVD, electrophoresis, etc

Q6 :What kind of material does the product material classification have?
A :Aluminum alloy castings, zinc alloy castings, stainless steel punching parts, stainless steel pipe fittings, stainless steel
castings, cast iron parts, injection molding parts, copper parts, etc.

Q7 :How long is the cycle time of mass production?
A :30 to 60 days.

Q8 :What is the port of shipment?
A :Ningbo Port and Shanghai Port.
APP
Post My RFQ
WhatsApp
+86-17326049340