Products
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin
Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin

Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin

FOB Reference Price: Get Latest Price
≥10 Square meters
US $30
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Structure:
Galvanized Steel Frame + Sandwich Panel
Size:
Customized Size
Door:
Steel Security Door
Roof:
Color Sandwich Panel
Wall:
50/75/100mm Sandwich Panel
Window material:
Aluminun Sliding Window
Wall panel:
EPS /ROCK WOOL /PU /GLASS WOOL Sandwich panel
Certification:
ISO9001:2000 CE
Ceiling:
Gygsum Board
Floor:
PVC Floor/MGO/Fiber cement board

Quick Details

Place of Origin:
Guangdong, China
Brand Name:
Yaoda
Model Number:
K1 Khouse
Structure:
Galvanized Steel Frame + Sandwich Panel
Size:
Customized Size
Door:
Steel Security Door
Roof:
Color Sandwich Panel
Wall:
50/75/100mm Sandwich Panel
Window material:
Aluminun Sliding Window
Wall panel:
EPS /ROCK WOOL /PU /GLASS WOOL Sandwich panel
Certification:
ISO9001:2000 CE
Ceiling:
Gygsum Board
Floor:
PVC Floor/MGO/Fiber cement board

Easy Installed Portable Cabin Prefabricated House/Porto Cabin/Porta Cabin

Product Description

Product Specifications

Item No.

T luxury prefabricated house   YDT0036

Size

Customized

Material

Galvanized steel structure with sandwich panel wall and doors, windows, etc.

Steel structure

8# C steel &H selection steel

Wall Panel

50mm/75mm/100mm/150mm sandwich panel

Sandwich panel style

EPS/ PU/Rock wool sandwich panel

Roof

EPS/ PU/ Rock wool fireproof sandwich panel

Window

Plastic steel sliding window or customized

Door

Steel frame with sandwich panel/ Steel security door /customized

MOQ

20Square meter

Floor

Plywood board /Cerment board

Wind resistance

Grade 11

Earthquake resistance

Grade 7

Snow load capacity of roofing

0.6kn/m2

Live load capacity of roofing

0.6kn/m2

Wall permitted loading

0.6kn/m2

Wall heat transmission coefficient

0.35kcal/m2hc

Density of rock wool

60kg/m2

Density of PU

40kg/m2

Density of EPS

12kg/m2

Density of IPES

20kg/m2

Desity time

Normally 20-25 days

Container loading

320m2

Characteristics:

1) T is the prefab unit 1T=950 mm.
2) T house can be done as 1 floor, 2 floors or 3 floors building.
3) All the steel structures are hidden inside. Very nice appearance and modern design.
4) T house is good with good water proof, fire proof, heat insulation and sound insulation performance.
5) T house uses reusable materials and is more environment friendly, It can be assembled and

disassembled six times.
6) All the steel structures are well painted and anti-rust which can be normally used for more than 20

years without any building garbage.
7) T house only requires level concrete floor for the foundation.
8) Easy installation, the house is connected by screw and bolt.
9) 6 labors one team, each day can install more than 300 m2.

Product Advantage

Strength and durability:

Shock-resistant & wind-resistant q235(yield strength)steel frame.

Good quality eps sandwich panel brings heat insulation and damp proof make

Comfortable living. The prefab house is designed as water proof, so extra waterproof treatment is unnecessary

Movable and recyclable:

Can be moved by any kind of vehicle after convenient disassembly construction site/ campsite/mine lot/mountain area/disaster area)

Prefab houses can be recycled more than 5 times in it`s 20 years long service lifetime.

100% of the steel structure and 90% of the eps panel can be recycled in next assembly.

Convenient installation and Labor-saving:

All the parts of steel frame and eps panel are done in factory, all need to do in the construction field is to connect and stack

100 sqm prefab house will just cost 2 days by only 4 workers.

The welding and cutting of steel is considered to be specialized labor and can increase construction expenses, yet overall it is still lower than conventional construction.

Transport:

Prefabricated modules can also be easily transported by ship, truck or rail, because they already conform to standard shipping sizes.

Guangdong Yaoda House Technology Co., Ltd.

Yaoda Housing Technology Group was founded in 1995. Until 2019 it already has consecutive 24 glorious years, which has made itself become the leader in the professional compact light-steel houses industry and its brand is recognized as one of the most popular ones in China simultaneously.

With unceasing effort in developing and upgrading dozens of product types and technologies over the years, the group has obtained lots of National Patents with respect innovation and technology. In the other words, Yaoda can provide full range of light-steel construction housing products, like light-steel fittings, building boards, mobile houses, container houses, light-steel villa and chalet houses, ,etc.

At the meantime, the group owns approximately 400 employees, including more than 100 senior technicians and a professional installation team of over hundred people. The annual production and installation capacity reaches more than 200,000 m².

The group has 50,000 square meters of production base, equipped with many self-developed modern automatic production lines.

FAQ

Q1: Are your company a factory or trading company? Where is your factory?

A1:We are factory and located in Foshan. It takes half an hour from Guangzhou Baiyun International airport to our factory.

Q2: What is the advantage of your factory?

A2:We founded in 1995. We are the main drafter of China prefabricated house state stadard. We have 2 production base and covered more than 80 thousand square metres. Strong scal is beneficial us to reduce cost. High performance team could provide top production and service.

Q3: Have you ever coorperate with government or famous international company?

A3:We have cooperated with China oversea construction, China construction, U.N specified supplier, Indonesia government, Timor government, Saudi Binladan Group, UCC con struction company and Nigeria’s FTZ .

Q4: What kind of production do you have? If I have project, how to cooperate?

A4:Our productions have prefabricated house, container house, steel structure and light steel villa. Generally, we will understand the details of customer’s project, it include project ad dress,usage, drawing, climate, geological condition and so on. Then we will provide resonable solution to customer.

Q5: What is the Delivery time?

A5:Within 25 workdays after confirming the drawings.

Q6: What is your quality control procedure?

A6:Our company have pass ISO9000,and all of production process is executing according to ISO9000 system file.

Q7: Could you supply the service of installation?

A7:Yes, we have 20 experienced supervisors who go to guide the installation at any time. Meanwhile,we have skilled installation team who could finishi some turn-key projects.

Q8: What is your opinion about the customer relationship ?

A8:We would like to establish long-term business relations with our every customer.with our strong team and production ability, We would like to support our customer according to our customers requirements.

APP
Post My RFQ
WhatsApp
+86-17326049340