- Product Details
- {{item.text}}
Quick Details
-
Certification:
-
ce,msds, rohs,
-
Model Number:
-
4r25p
-
Place of Origin:
-
Guangdong, China
-
Jacket:
-
PVC
-
Type:
-
Carbon Zinc
-
Package:
-
bulk package
-
Shelf life:
-
3 Years
-
If OEM/ODM:
-
Yes
-
stock:
-
available
-
sample:
-
welcome
-
Shippment:
-
by sea, by air, or express
-
MOQ:
-
500 pcs
Quick Details
-
Battery Size:
-
4r25
-
Warranty:
-
3 years
-
Brand Name:
-
PKCELL
-
Certification:
-
ce,msds, rohs,
-
Model Number:
-
4r25p
-
Place of Origin:
-
Guangdong, China
-
Jacket:
-
PVC
-
Type:
-
Carbon Zinc
-
Package:
-
bulk package
-
Shelf life:
-
3 Years
-
If OEM/ODM:
-
Yes
-
stock:
-
available
-
sample:
-
welcome
-
Shippment:
-
by sea, by air, or express
-
MOQ:
-
500 pcs
Hot selling non-rechargeable power 4r25 4r25p 6v lantern heavy duty battery
Related Products
Model | Jacket | Volt. | Duration | Pcs/Blister | Pcs/Box | Pcs/CTN | G.W(kg) | N.W(kg) | CBM (L*W*H CM) |
R20P | Alu/PVC | 1.5V | 720min | 2 | 12 | 96 | 9 | 8 | 33.0*25.0*22.0 |
R14P | Alu/PVC | 1.5V | 280min | 2 | 12 | 144 | 7 | 6 | 30.0*28.5*21.0 |
R6P | Alu/PVC | 1.5V | 105min | 2 | 24 | 288 | 5 | 4 | 33.5*27.0*20.3 |
Alu/PVC | 4 | 48 | 576 | 8 | 7 | 33.5*32.5*20.3 | |||
R03P | Alu/PVC | 1.5V | 45min | 2 | 24 | 288 | 4 | 3 | 27.6*26.6*20.3 |
Alu/PVC | 4 | 48 | 576 | 7 | 6 | 27.6*26.6*20.3 | |||
6F22 | Metal | 9V | 240min | 1 | 10 | 240 | 6 | 5 | 33.5*29.5*21.0 |
3R12 | Paper | 4.5V | 330min | 1 | 10 | 120 | 26 | 25 | 42.0*28.0*13.0 |
4R25 | Paper | 6V | 1000min | 1 | 4 | 24 | 14 | 13 | 36.0*27.0*26.8 |
Application
Widely used for Digital Camera, MP3/MP4, Flashlight, Electric Torch, CD/MD, Toy, etc.
Packaging & Shipping
Packing:
Shrink/Blister/colour box/clamshell/Customized Package
1. All shipping goods are 100% inspected and packed very well.
2. The images shown are for your reference Only.
Delivery:
Any means of transportation is available.
For samples: Support free samples, delivery within 1-2 days.
For PKCELL brand: Sufficient stocks, delivery at any time.
For OEM: Within 100k pcs, 10-15 days; 100-500k pcs, 15-20 days; over 500k pcs, 25-30 days.
Production Process
Our Advatages &Customer feedback