Products
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench
Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench

Metal iron 3-tiers shelves space-saving shoe storage bench hall tree entrance coat rack with 18 hooks and bench

FOB Reference Price: Get Latest Price
≥150 Pieces
US $20
≥500 Pieces
US $18
≥1000 Pieces
US $15
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Material:
Metal
Metal Type:
steel
Place of Origin:
Fujian, China
Brand Name:
HY
Model Number:
HY-OCR9 coat rack
product name:
shoe bench coat rack
color:
white, black etc
function:
shoe/hat/coat rack
frame material:
steel tube
steel finish:
powder coating
package:
PE bag+brown export carton
packing size:
69*35*20CM(1PCS)
sampling time:
6-8 days
lead time:
30-40 days

Quick Details

Mail packing:
Y
Application:
Living Room
Design Style:
Modern
Material:
Metal
Metal Type:
steel
Place of Origin:
Fujian, China
Brand Name:
HY
Model Number:
HY-OCR9 coat rack
product name:
shoe bench coat rack
color:
white, black etc
function:
shoe/hat/coat rack
frame material:
steel tube
steel finish:
powder coating
package:
PE bag+brown export carton
packing size:
69*35*20CM(1PCS)
sampling time:
6-8 days
lead time:
30-40 days

Item No. HY-CR6
Name coat rack
Color customized
Material steel tube,powder coating, waterproof and rustproof
Size 67*32*183CM
Packing Polybag, brown export carton
MOQ 1pcs
Trade term EXW, FOB, CIF, ect.
Payment term TT, LC

Loading port

Xiamen, China

Buyers could use their own shipping agent.

If not,we will help customers arrange everything about shipping.

Quality control

1. IQC, Incoming Quality Control when purchasing raw material.

2. IPQC: Input Process Quality Control in every procedure.

3. FQC: Finish Quality Control when products were completed.

4. OQC: Outgoing Quality Control before shipping.

5. Quality Tracking and Quality Improve Meeting after shipping.

Payment terms

1. 30% deposit in advance, 70% against copy of BL. Or L/C at sight.

2. For massive order, detailed payment terms can be negotiated accordingly.

Lead time

1. High season (Sept. to Mar.): 35-40days

2. Low Season (Apr. to Jul.): 25-35 days

3. Trial order or sample order can be flexible by prioritizing.

4. A detailed production schedule for each order will be drew up and it is a platform for further communication between customer and us.

APP
Post My RFQ
WhatsApp
+86-17326049340