The project is located in Russia, using 3 sets of 600kw natural gas-fired internal combustion generator sets. After the project operation, it provided stable power and heat for the customer's plant.
- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
RH-500GFT
-
Rated Voltage:
-
400/230v
-
Rated Current:
-
902A
-
Speed:
-
1000/1200rpm
-
Frequency:
-
50/60HZ
-
Product name:
-
Gas turbine generator piston engine 500 kw natural gas generator
-
Engine brand:
-
JPEC
-
Engine Type:
-
Air-cooled Gas Engine
-
Fuel type:
-
Natrual Gas Biogas Fuel
-
Start method:
-
24V DC Electrical Start
-
Alternator Brand:
-
Siemens Etc
-
Alternator:
-
Siemens Licence
-
Generator Output Power:
-
500kw
-
Power efficiency:
-
0.8(Lag) Gas Generator
-
Displacement:
-
71.45L
Quick Details
-
Warranty:
-
1year
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Ronghuan
-
Model Number:
-
RH-500GFT
-
Rated Voltage:
-
400/230v
-
Rated Current:
-
902A
-
Speed:
-
1000/1200rpm
-
Frequency:
-
50/60HZ
-
Product name:
-
Gas turbine generator piston engine 500 kw natural gas generator
-
Engine brand:
-
JPEC
-
Engine Type:
-
Air-cooled Gas Engine
-
Fuel type:
-
Natrual Gas Biogas Fuel
-
Start method:
-
24V DC Electrical Start
-
Alternator Brand:
-
Siemens Etc
-
Alternator:
-
Siemens Licence
-
Generator Output Power:
-
500kw
-
Power efficiency:
-
0.8(Lag) Gas Generator
-
Displacement:
-
71.45L
Biogas methane gas turbine generator piston engine 500 kw natural gas generator
Application field

Fuel
:
Natural gas, biogas, biomass gas, coal-bed methane gas, coal gas, oilfield associated gas, etc.
Generator set working principle: Internal combustion engine convert gas fuel into mechanical energy, then convert into electricity power by alternator.
Specifications
Generator Model
|
RH-500GFT
|
RH-600GFT
|
RH-700GFT
|
Prime Power
|
500kw
|
600kw
|
700kw
|
Alternator brand
|
Siemens
|
Siemens
|
Siemens
|
Voltage and frequency
|
110v- 11000v 50/60HZ
|
110v- 11000v 50/60HZ
|
110v- 11000v 50/60HZ
|
Generator efficiency
|
32-36%
|
32-36%
|
32-36%
|
Engine model
|
12V190
|
12V190
|
12V190
|
Rotating Speed
|
1000/1200 rpm
|
1000/1200 rpm
|
1000/1200 rpm
|
Bore/Stroke
|
190/210mm
|
190/210mm
|
190/210mm
|
Displacement
|
71.45L
|
71.45L
|
71.45L
|
Generator Dimension
|
6000*1970*2375mm
|
6000x2100x2800mm
|
6000x2100x2800mm
|
Generator Net weight
|
11500kg
|
12000kg
|
13000kg
|
Lubricant oil average consumption
|
1.0g/kwh
|
1.0g/kwh
|
1.0g/kwh
|
Products Description
1. High configuration:
main components are all world-renowned brands, cost-effective, stable and reliable.
2. Multi-option of engine, alternator, PLC remote control system. Well performed control system & monitor instrument. Easy to operate and maintain, low running cost.
3. Long continuous running hours: 24/7, 8000 hours per year.
4. Low operation and maintenance cost, h igh return.
5. Manufacturer, OEM provided.
2. Multi-option of engine, alternator, PLC remote control system. Well performed control system & monitor instrument. Easy to operate and maintain, low running cost.
3. Long continuous running hours: 24/7, 8000 hours per year.
4. Low operation and maintenance cost, h igh return.
5. Manufacturer, OEM provided.



Spare parts
Ship within 5 working days after receiving request.
Certificate ,visitors & shipment
Successful case
1. Russia project
2. Rongcheng Garden Hotel Distributed Energy Station Project
The project is located in the basement of Rongcheng Garden Hotel, Changsha, using 3 sets1.1MW natural gas-fired internal combustion generator sets.
After the project is put into operation, the annual power generation capacity is
4.224 million kW, and the annual standard coal can be saved by 1348.6 tons.
The comprehensive utilization rate can reach 70%-85%.
3. Changsha Huanghua International Airport T2 Terminal Project
This project is located in Changsha City, Hunan Province, using 1.1mw
natural gas generator.
4.Chengdu Biomass Gas Generation Project
The project is located in Chengdu, with a installed capacity of LY800GH-S biomass gas
generator set. It uses tar-free biomass gas fuel. When the low heat value is
1200kcal/m3, the unit power is 800 kW.
generator set. It uses tar-free biomass gas fuel. When the low heat value is
1200kcal/m3, the unit power is 800 kW.
5.Changde Jinshi biogas project
Provided 2 x 1.1MW biogas generator sets forChangde Jinshi Biogas Project, and the
project is under construction.
project is under construction.
6. Xiaohuigou Coal Mine Low Concentration Gas Power Generation Project
The project is located in Xiaohuigou Coal Mine, Mayutown, Qingxu County, Shanxi Province.
The construction scale is 10MW, and the annual power generation is expected to be
7200×104kW•h. Provides 10×1MW low-concentration gas engine.
The construction scale is 10MW, and the annual power generation is expected to be
7200×104kW•h. Provides 10×1MW low-concentration gas engine.
Recommend Products
FAQ
Q1. How to find suitable generator?
A:Tell me how many kw you need, and gas type, voltage and frequency, then right model will be recommend.
Q2. What is your transport?
A: Generator set recommend ship by sea or by cargo on land.
Q3. What is your terms of payment?
A: 30% TT in advance as deposit, and 70% balance paid before delivery.
Q4. What is your terms of price?
A: EXW, FOB, CIF, CFR.
Q5. How about your delivery time?
A: Normally 25 days - 50 days after we receive advance payment. Depends on order size and generator model.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. Inspect by third party also acceptable.
A:Tell me how many kw you need, and gas type, voltage and frequency, then right model will be recommend.
Q2. What is your transport?
A: Generator set recommend ship by sea or by cargo on land.
Q3. What is your terms of payment?
A: 30% TT in advance as deposit, and 70% balance paid before delivery.
Q4. What is your terms of price?
A: EXW, FOB, CIF, CFR.
Q5. How about your delivery time?
A: Normally 25 days - 50 days after we receive advance payment. Depends on order size and generator model.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. Inspect by third party also acceptable.
You are highly welcomed to ask questions and leave message.
Tel:/Wechat:/What's up: 0086 13964142686 (Selena Wang)
Hot Searches