- Product Details
- {{item.text}}
Quick Details
-
Brand Name:
-
OEM Melting Furnace
-
Voltage:
-
110V/220V
-
Dimension(L*W*H):
-
45*40*35cm
-
Weight (T):
-
0.01 T
-
Power (kW):
-
1.5
-
Product Name:
-
Melting Furnace
-
Max temperature:
-
1150℃
Quick Details
-
Place of Origin:
-
Fujian, China
-
Marketing Type:
-
Hot Product 2023
-
Core Components:
-
Melting Furnace
-
Brand Name:
-
OEM Melting Furnace
-
Voltage:
-
110V/220V
-
Dimension(L*W*H):
-
45*40*35cm
-
Weight (T):
-
0.01 T
-
Power (kW):
-
1.5
-
Product Name:
-
Melting Furnace
-
Max temperature:
-
1150℃
Electric Melting Furnace 1/2/3KG Induction Melting Ovan Furnace for Aluminum, Copper, Gold, Lead, Silver
![](https://cdn.bestsuppliers.com/seo_products_img/pekaimachine/13b71c0c6b723bb8a44749082e829c8e.jpg!/rotate/180)
Specifications:
Voltage: 220V/110V
Power: 1400-1700W
Capacity: 1kg/2kg/3kg
Weight: 9kg / 12KG
packing size: 45*30*30cm
Maximum temperature:1150° C
Accessories: one tong, one crucible,and one power cord cable
![](https://cdn.bestsuppliers.com/seo_products_img/pekaimachine/93b61642ef563d10ab0fae52480df4d4.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/pekaimachine/edf42d9e8cd436ea80ee6a4cc46b776f.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/pekaimachine/b0c6b34c53d137e5bf951311c0774a0b.jpg!/rotate/180)
Details:
melted metal: Aluminum, Copper, Gold, Lead, Silver, Sterling Silver, Tin & Zinc Gold meltingf furnace working instructions: 1.will melt gold machine put smoothly;
2. and carefully examine whether products,then will cover intact,dissolve gold open check whether the vessel intact
3. connecting swith power supply,electrictity,light switch;
4. and the normal work,intelligent temperature controller with the digital furnace temperature and slowly rising,if there are any complicatios,be sure to stop using it;
5. in the process of operation,the furnace temperaturedegrees will spread,staff shall not move and collision,avoid scald
and damage;
and damage;
6. in june,when the temperature reached gold and gold rains melring point,staff according to demand will continue to
increase.when the maximum temperature reached 1,100 degrees in 28°C,will stop work or in cooling condition;
increase.when the maximum temperature reached 1,100 degrees in 28°C,will stop work or in cooling condition;
7. gold,be sure to disconnect the power supply,then use to operate,go profssional pliers to ensure their safety;
8. and shall immediately take gold after moving machines,owing to the high temperature,can easily damaged internal components,and burns itself to its cooling,10-20 minutes,to ensure the service life of the products;
9. Every time interval must be in 30-60 minutes,very easy to damage the product;
10. For precision machine,please dont remove the professional technology,to ensure accuracy;
11. Please pay attention to safety and maintain normal use of machine.
Product Display
Hot Searches