We track installations on site. Installation manual is offered and we support online remote guidance for accurate commissioning.
For special requirements, factory can send engineers to the site.
- Product Details
- {{item.text}}
Quick Details
-
Application:
-
Restaurant
-
Design Style:
-
Modern
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
bode
-
Model Number:
-
BD65
-
Product name:
-
Dumbwaiter Elevator traction motor
-
Warranty Time:
-
3years
-
Load capacity:
-
100kg-500kg
-
Control:
-
Elevator Control System
-
Type:
-
Traction Machine
-
speed:
-
1m/s
-
Power:
-
110/220/380v 3 phase
-
Delivery Time:
-
stock
-
Keywords:
-
motor
-
Certification:
-
CE ISO
Quick Details
-
Warranty:
-
3 years
-
After-sale Service:
-
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement
-
Project Solution Capability:
-
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation
-
Application:
-
Restaurant
-
Design Style:
-
Modern
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
bode
-
Model Number:
-
BD65
-
Product name:
-
Dumbwaiter Elevator traction motor
-
Warranty Time:
-
3years
-
Load capacity:
-
100kg-500kg
-
Control:
-
Elevator Control System
-
Type:
-
Traction Machine
-
speed:
-
1m/s
-
Power:
-
110/220/380v 3 phase
-
Delivery Time:
-
stock
-
Keywords:
-
motor
-
Certification:
-
CE ISO
Product Description


Contact business WhatsApp/WeChat +86 19953867030
Do you have to carry laundry, groceries, food, files, garbage, firewood, or other heavy loads from one floor of your home to another? A dumbwaiter elevator(sundries elevator) is a helping hand you can always count on!
we supply traction motor for dumbwaiter elevator

inside parts

inside parts
Specification
Loading capacity
|
50-500kg
|
Lifting height
|
customized
|
Cabin size
|
600*600*800mm (W*D*H) or customizedwindow or floor type
|
Speed(m/s)
|
0.4/1m/s
|
Raw material
|
201/304 Stainless steel
|
Power input
|
380v/3 phase/ 50hz(or 110v,220v)
|
Warranty
|
3 year
|
Customer Photos
Install
Site install
Product packaging
FAQ
Q1: Can you accept customization and ODM/OEM?
A: Yes, of course, we are a professional manufacturer, need to tell us the lifting height, load capacity and platform size, we can
design according to your requirements.And we accept ODM/OEM.If there is necessary, we can put your logo on the package and product
body.
Q2. How can we guarantee the good quality of your products?
A:In during the production process we will inspect all purchased and produced parts and take a record after put in crates, before
shipping out we will do the final inspection and take photo and video as record to make customer being at ease.
Q3: What is your payment terms?
A:TT and L/C are acceptable and TT will be more appreciated. Other terms can also be discussed.50% deposit can be paid first for
production, and the balance can be made up before delivery.
Q4:Shipping&price term?
A: Both FOB/CIF/DDP price term are ok,we have reliable forwarder helping arrange the shipment for you.
Q5: How long is your delivery date?
A:*The general specification of the product is about 14 days after receiving the advance payment.
*Special requirements take about 20-30 days.
Q6. How to do with the elevator installation and maintenance?
A: We will provide installation instructions and installation videos, and our technicians can also provide online video guidance
through chat software, such as whatsapp, wechat, skype and etc.
Q7 . What's your guarantee time?
A: We will provide you the free spare parts delivered along with the container.If any parts get damaged due to quality issue
within 12 months after B/L date. We will send new replacement once confirmed.And our service has no time limit.
A: Yes, of course, we are a professional manufacturer, need to tell us the lifting height, load capacity and platform size, we can
design according to your requirements.And we accept ODM/OEM.If there is necessary, we can put your logo on the package and product
body.
Q2. How can we guarantee the good quality of your products?
A:In during the production process we will inspect all purchased and produced parts and take a record after put in crates, before
shipping out we will do the final inspection and take photo and video as record to make customer being at ease.
Q3: What is your payment terms?
A:TT and L/C are acceptable and TT will be more appreciated. Other terms can also be discussed.50% deposit can be paid first for
production, and the balance can be made up before delivery.
Q4:Shipping&price term?
A: Both FOB/CIF/DDP price term are ok,we have reliable forwarder helping arrange the shipment for you.
Q5: How long is your delivery date?
A:*The general specification of the product is about 14 days after receiving the advance payment.
*Special requirements take about 20-30 days.
Q6. How to do with the elevator installation and maintenance?
A: We will provide installation instructions and installation videos, and our technicians can also provide online video guidance
through chat software, such as whatsapp, wechat, skype and etc.
Q7 . What's your guarantee time?
A: We will provide you the free spare parts delivered along with the container.If any parts get damaged due to quality issue
within 12 months after B/L date. We will send new replacement once confirmed.And our service has no time limit.
Hot Searches