- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
0225
-
Product Name:
-
Arcade Fighting Game Machine
-
Material:
-
Hardware+Glass steel+plastic
-
Size:
-
90*95*168CM
-
Item Name:
-
Frighting Machine
-
Player:
-
1 player
-
Screen:
-
32"LCD
-
Voltage:
-
220V
-
Power:
-
150W
-
Weight:
-
80KG
-
Warranty:
-
12 Months
Quick Details
-
Type:
-
Street Basketball & Boxing
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
HUATAI BAISHUN
-
Model Number:
-
0225
-
Product Name:
-
Arcade Fighting Game Machine
-
Material:
-
Hardware+Glass steel+plastic
-
Size:
-
90*95*168CM
-
Item Name:
-
Frighting Machine
-
Player:
-
1 player
-
Screen:
-
32"LCD
-
Voltage:
-
220V
-
Power:
-
150W
-
Weight:
-
80KG
-
Warranty:
-
12 Months
Features
The life of the display is 3 times that of the ordinary old LCD, and it does not suffer from aging phenomena such as yellow and dark.
Product introduction
Main wire: This fighting wire and the traditional fighting machine interface is basically the same as all the game show versions on the market, our wire for the customized product of the complete set of wire using pure copper wire to minimize the delay. And all the loss and vulnerable interface parts are connected separately.
Wire pure copper core production greatly reduces the sense of delay and slows down the aging (hardening) speed compared to other wires, and the interface is split separately to make the interface of frequently disassembled parts flexible to allow users to maintain and maintain simply and easily.
Packing Parameter
Packing size : | D110*W115*H188CM |
Total volume in : | ≈2.4 Cubic metre |
TOTAL weight : | ≈150 KG |
Packaging : | Wooden frame |
Q1.How about malfunction?
A: Our technician will make a professional solution with picture or video for customer, which shows how to operate step by step. If the spare part breaks we will replace it for customer with kind of charge or without charge.
Q2.Can you provide OEM or ODM service?
A: Yes. Our company professionally takes OEM and ODM service depending on our excellent R&D team, perfect quality and lighting solutions, just tell us your ideas.
Q3.What about the lead time?
A: Mass order delivery time about 35-40 days, base on your quantity.
Q4.How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling through the production process. We are surely confident that our price is more competitive than others on top of the same quality.
Q5.What is the terms of delivery?
A: We accept FOB, EXW. You can choose one of the most convenient and cost effective way.
Q5: Is it difficult to install the machine?
A: It is easy to install. We basically complete the installation before the product is packaged, and only need to partially assemble. We will provide detailed installation instructions, so don't have to worry about assemble.