- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
Hebei, China
-
Diameter of shaft:
-
50 mm
-
Raw material:
-
Galvanized Steel Sheet
-
Width of the raw material:
-
130mm
-
Thickness of the raw material:
-
1-1.5mm
-
Rows of rollers:
-
12 rows
-
Shaft material:
-
High grade 45# forged steel
-
Roller material:
-
High grade 45# forged steel, surface hard chromium plating
-
Cutting blade material:
-
Cr12 Heat Treatment
-
PLC:
-
Delta
Quick Details
-
Type:
-
Tile Forming Machine
-
Tile Type:
-
Colored Steel
-
Production Capacity:
-
10-15 m /min
-
Place of Origin:
-
Hebei, China
-
Diameter of shaft:
-
50 mm
-
Raw material:
-
Galvanized Steel Sheet
-
Width of the raw material:
-
130mm
-
Thickness of the raw material:
-
1-1.5mm
-
Rows of rollers:
-
12 rows
-
Shaft material:
-
High grade 45# forged steel
-
Roller material:
-
High grade 45# forged steel, surface hard chromium plating
-
Cutting blade material:
-
Cr12 Heat Treatment
-
PLC:
-
Delta
shutter door guide rail cold roll forming machine
Processing F low D iagram of M achine :
Production Process :
Uncoiling→ Feeding material into machine →Roll forming → Auto cutting →Products receiving
Technical parameters :
Suitable Material |
Material |
Galvanized Sheet |
Thickness |
1 -1.5 mm |
|
Material of rollers |
High grade 45# forged steel , surface hard chromium plating |
|
Rows of rollers |
1 2 stations |
|
Material of shafts |
High grade 45# forged steel |
|
Diameter of shaft s |
5 0mm |
|
Material of blade |
Cr12 Heat Treatment |
|
Speed |
15-20 m/min |
|
Side plate thickness |
16 mm |
|
Total power |
4 kw |
|
Voltage |
380 V 50HZ 3Phase |
|
Appearance size (About) |
45 0 0mm*8 0 0mm*15 0 0mm |
|
Electronic control system |
PLC + Touch Screen |
Standard Configuration :
1 ton Manual decoiler |
1 set |
Main roll forming machine |
1 set |
Hydraulic pump system |
1 set |
PLC control system |
1 set |
Receiving Table |
1 set |
S pare parts |
1 set |
Manual Decoiler
Capacity |
1 T |
Inner Diameter |
450-550mm |
Width |
300 mm |
Spare Parts
Receiving Table
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 2 0 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment .
Delivery Time
Within 3 5 days after receiving deposit .
Warranty
Two year s , and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you . But y ou need to provide the cost of the engineer .