- Product Details
- {{item.text}}
Quick Details
-
Power:
-
3000W
-
Weight:
-
15 KG
-
Dimension(L*W*H):
-
450*485*240mm
-
Year:
-
2022
-
Name:
-
crepe making machine
-
Model:
-
KL-NP-583
-
Application:
-
Food Processing Machine
-
Material:
-
304 Stainless Steel
-
MOQ:
-
1 Set
-
Heating method:
-
Elecrtic/Gas Heating
-
Packing:
-
Carton + foam
-
Final product:
-
Crepe
-
Shape:
-
Round Head
-
Type:
-
Snacks Processing Line
Quick Details
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
kellen
-
Voltage:
-
220V
-
Power:
-
3000W
-
Weight:
-
15 KG
-
Dimension(L*W*H):
-
450*485*240mm
-
Year:
-
2022
-
Name:
-
crepe making machine
-
Model:
-
KL-NP-583
-
Application:
-
Food Processing Machine
-
Material:
-
304 Stainless Steel
-
MOQ:
-
1 Set
-
Heating method:
-
Elecrtic/Gas Heating
-
Packing:
-
Carton + foam
-
Final product:
-
Crepe
-
Shape:
-
Round Head
-
Type:
-
Snacks Processing Line
![](https://cdn.bestsuppliers.com/seo_products_img/chkellen/64e622065d2b3ada93c2573e4c27ad5c.jpg!/rotate/180)
▶Specifications
![](https://cdn.bestsuppliers.com/seo_products_img/chkellen/e5043354fe883846885528dfc77ea436.jpg!/rotate/180)
Model
|
KL-NPE-583
|
KL-NPE-584
|
KL-NPE-585
|
KL-NPE-586
|
Type
|
Electric
|
Electric
|
Gas
|
Gas
|
Number
|
Single-head
|
Double-head
|
Single-head
|
Double-head
|
Voltage
|
220V/110V
|
220V/110V
|
/
|
/
|
Power
|
3KW
|
6KW
|
/
|
/
|
▶Product Description
![](https://cdn.bestsuppliers.com/seo_products_img/chkellen/83f44f2f870a31519490d39041bad39e.jpg!/rotate/180)
Creamy cake machine is divided into electric heating and gas heating.
It is a street snack equipment for fast making crepes.
Low cost and high yield are the reasons why it is popular.
Come and buy Machines. Start your business and make a lot of money.
![](https://cdn.bestsuppliers.com/seo_products_img/chkellen/8cf5610c09c936c785b00adca99fe0d6.jpg!/rotate/180)
Related Products
▶Packing & Delivery
Why Choose Us?
♦ Project Design
Assist you to choose equipment, design production process flow According to the customer actual production environment and production requirements.
♦ Installation Training
Provide telephone guidance for equipment installation and debugging; or send technician to install and debug machine and train your workers if needed. Provide free relevant training as customer required.
Long-term technical support.
♦ After-sale service
One year warranty, life-long maintenance;
24 hours online for technical consulting service;
Once Problems on equipment, provide phone or on-site troubleshooting fault response plan.
♦ One year warranty time
From the date which the product is qualified commissioning. Any damage except the wrong operation during warranty period is repaired freely. But the travel and hotel expenses should be paid by buyer.
♦ Oversea service
Engineers available to service machinery overseas.
♦ Response with 24hour
We value every inquiry sent to us, ensure quick competitive offer within 24 hour.
♦ Full document
All necessary document will be provide .
♦ Payment way
We accept multiple terms of payment, such as L/C, T/T, western Union, Money Gram, AlibabaTade Asurance.
Assist you to choose equipment, design production process flow According to the customer actual production environment and production requirements.
♦ Installation Training
Provide telephone guidance for equipment installation and debugging; or send technician to install and debug machine and train your workers if needed. Provide free relevant training as customer required.
Long-term technical support.
♦ After-sale service
One year warranty, life-long maintenance;
24 hours online for technical consulting service;
Once Problems on equipment, provide phone or on-site troubleshooting fault response plan.
♦ One year warranty time
From the date which the product is qualified commissioning. Any damage except the wrong operation during warranty period is repaired freely. But the travel and hotel expenses should be paid by buyer.
♦ Oversea service
Engineers available to service machinery overseas.
♦ Response with 24hour
We value every inquiry sent to us, ensure quick competitive offer within 24 hour.
♦ Full document
All necessary document will be provide .
♦ Payment way
We accept multiple terms of payment, such as L/C, T/T, western Union, Money Gram, AlibabaTade Asurance.
Hot Searches