Products
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm
GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm

GETO Aluminium Formwork Building Form 6061-T6 Aluminum Alloy 300-400 Times 4mm

FOB Reference Price: Get Latest Price
≥1 Square meters
US $100
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Application:
Apartment
Design Style:
Modern
Type:
formwrok, building form
Place of Origin:
Jiangxi, China
Brand Name:
GETO
Model Number:
6061-T6
Material:
6061-T6 Aluminum Alloy
Size:
100mm to 600mm in width
Thickness:
4mm
Name:
GETO aluminium formwork
Color:
Silver White
Certificate:
Singapore BCA Band-2 ; ISO9001; ISO14001 ; ISO18001
Reusable times:
200-300 times
Average weight:
20-30KG

Quick Details

Warranty:
5 years
After-sale Service:
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement
Project Solution Capability:
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation, Others
Application:
Apartment
Design Style:
Modern
Type:
formwrok, building form
Place of Origin:
Jiangxi, China
Brand Name:
GETO
Model Number:
6061-T6
Material:
6061-T6 Aluminum Alloy
Size:
100mm to 600mm in width
Thickness:
4mm
Name:
GETO aluminium formwork
Color:
Silver White
Certificate:
Singapore BCA Band-2 ; ISO9001; ISO14001 ; ISO18001
Reusable times:
200-300 times
Average weight:
20-30KG

Items Aluminium formwork
1. Material Alu-formwork thickness 4mm
2.Installation

After short period of training, workers can easily learn to install and dismantle the formwork.

3.Construction period 8 days per storey.
4.Machine assistance

Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as:

1) Shifting of reinforcing steel rebar into assembly point

2) Removing debris from site

3) Loading and Unloading materials from trucks into site storage area.
5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 30-50 KN per sqr meter , which can generate good integrality and uniform load . Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.

Product Advantages

Related Products

Production Process

Logistics and Transp

Installment Scene

Our Company

Exhibition

Our Service

How to contact us?
Send your enquiry details below for the "free sample", click "send" Now !!!! We will get back to you immediately!

APP
Post My RFQ
WhatsApp
+86-17326049340