- Product Details
- {{item.text}}
Quick Details
-
Rolling Speed (m/min):
-
1 - 4
-
Warranty of core components:
-
24 months
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
Colgar
-
Year:
-
2024
-
Weight (KG):
-
1000 KG
-
Motor Power (kw):
-
11 kw
-
Certification:
-
ce
-
After-sales Service Provided:
-
Video technical support
-
After Warranty Service:
-
Field maintenance and repair service
-
Raw Material:
-
Sheet
-
Application:
-
Steel Plate Sheet Rolling
-
Product name:
-
Three Roller Bending Machine
-
Usage:
-
Metal Sheet Rolling Bending
-
Type:
-
Hydraulic Bending Tools
-
Keyword:
-
Stainless Steel Plate Rolling Machine
-
Function:
-
Roll Bending Plate
Quick Details
-
Max. Working Length (mm):
-
2500 mm
-
Max. Plate Thickness (mm):
-
12 mm
-
No. of Roller:
-
3
-
Rolling Speed (m/min):
-
1 - 4
-
Warranty of core components:
-
24 months
-
Place of Origin:
-
Anhui, China
-
Brand Name:
-
Colgar
-
Year:
-
2024
-
Weight (KG):
-
1000 KG
-
Motor Power (kw):
-
11 kw
-
Certification:
-
ce
-
After-sales Service Provided:
-
Video technical support
-
After Warranty Service:
-
Field maintenance and repair service
-
Raw Material:
-
Sheet
-
Application:
-
Steel Plate Sheet Rolling
-
Product name:
-
Three Roller Bending Machine
-
Usage:
-
Metal Sheet Rolling Bending
-
Type:
-
Hydraulic Bending Tools
-
Keyword:
-
Stainless Steel Plate Rolling Machine
-
Function:
-
Roll Bending Plate
Products Description
The Features:
1, High Precision end Pre-bending
The straight enge length can be set freely, the upper roller press to pre-bend NC Control, high productivity.Parameters are
controlled by NC, easy for operation, improve the productivity greatly
2, Good accuracy
The upper roller is like a drum, the lower rollers assorted with it through support rollers. Bend continuously, can roll ideal
products from thin to thick plates widely
3, Safety
The lower rollers are fixed, the upper roller move vertically and horizontally. The job does not work with the working rollers.
Complete structure, simple foundation, convenient movement. The machines has unitary basement, does not need earth bolts, has simple foundation
Main parts:
1.Working rollers: cast steel ingot(chemical composition analysis):check performance-forging roughcast-forging annealing-UT flaw-roughing(chemical tests)-heat treatment(hardening and tempering)-UT flaw-semi finishing-finishing-MT.
2..Large forigings: cylinder body, gear, gear shaft forging roughcast-surface imspection-roughing-UT flaw-UT flwa detector hear treatmenat-finishing semi-finishing-MT.
3.Welding structure: racks, chassis, wheel box plate into the factory(chemical compositon analysis, mechanical
test)-pretreatment-for sheet metal cutting-welding-seam UT or RT flaw-annealing treatment-roughing-finishing-vibration
destressing-hot blasting-finishing 5-4 major parts of the manufacturing process.
2..Large forigings: cylinder body, gear, gear shaft forging roughcast-surface imspection-roughing-UT flaw-UT flwa detector hear treatmenat-finishing semi-finishing-MT.
3.Welding structure: racks, chassis, wheel box plate into the factory(chemical compositon analysis, mechanical
test)-pretreatment-for sheet metal cutting-welding-seam UT or RT flaw-annealing treatment-roughing-finishing-vibration
destressing-hot blasting-finishing 5-4 major parts of the manufacturing process.
The Technical Parameters
|
|
|
|
|
Discoloration due to quenching treatment of fuselage and rollers, Not easily deformed
Lead time
15 days to 40 days
Payment Method
30% T/T in advance, the balance paid before shipping
irrevocable L/C at sight
irrevocable L/C at sight
FAQ&Contact us
Q:How to choose a rolling machine?
A:Please tell us the following information in detail:
- Material of plate:
-Max thickness:
-Max plate width:
-If possible: you can specify the model;
Q:Where is your factory? How can I get there?
A:You can fly to NanJing LuKou airport directly, we will pick you up in the airport. All our customers, both inland and abroad, warmly welcome to visit us!
Q:How do you ensure quality in the factory?
A:Quality culture.:We always attach great importance to quality control from the beginning to the end. Our factory has obtained ISO, CE certification.
Q:How can I pay?
A:You can pay by T/T, Western Union, MoneyGram, Paypal; 30% deposit; pay off the 70% balance before shipment.
Q: How long to produce?
A: Delivery time:15-35 days.
Hot Searches