Products
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating
Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating

Italy Industrial Machine 0.06-2.1 MW CLHG Hot Water Boiler For hotels schools Heating

FOB Reference Price: Get Latest Price
≥1 Sets
US $2000
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Brand Name:
SFeng, SFeng
Dimension(L*W*H):
Depends on the capacity of boiler
Weight:
Depends on the capacity of size
Certification:
ISO 9001, ISO 14001,
Design thermal efficiency:
88%
Control system:
PLC+Touch Screen
Operation:
Fully Automatic Control
installation:
easy to install
Name:
SHL Steam Boiler
Capacity:
0.06-2.1 MW
Calorific capacity:
5-180 x10^4

Quick Details

Core Components:
serpentine tube, water pump, simons plc control
Steam Production:
2.1 MW
Place of Origin:
Zhejiang, China
Brand Name:
SFeng, SFeng
Dimension(L*W*H):
Depends on the capacity of boiler
Weight:
Depends on the capacity of size
Certification:
ISO 9001, ISO 14001,
Design thermal efficiency:
88%
Control system:
PLC+Touch Screen
Operation:
Fully Automatic Control
installation:
easy to install
Name:
SHL Steam Boiler
Capacity:
0.06-2.1 MW
Calorific capacity:
5-180 x10^4
Products Description

Biomass Coal Fired Hot Water Boiler CLHG

The SFeng CLHG-S series hot water boiler is a biomass pellet/coal/wood fueled boiler. It features a unique smokeless combustion technology, employing multiple air supplies at different heights in the furnace. This ensures a more complete combustion, complemented by a multi-tube energy-saving system. After biomass pellet combustion in the combustion chamber, the flue gas undergoes multiple cycles before being discharged, increasing the heating surface area by 30% and achieving a thermal efficiency of up to 88%. The boiler also optimizes the furnace grate area, adopting a double-sided segmented air supply with adjustable closed structure below the grate. This results in a uniform air intake, significantly improving the fuel burnout rate, achieving 99.5% combustion efficiency, and ensuring low emissions of CO², sulfur, and NOx, meeting environmental requirements.
Product Configuration
NO.
Thermal Power
(MW)
Calorific Value
(10^4Kcal)
Weight
Water Inlet/outlet
Outfall
Max Load Fuel Consumption
Soli Capacity
(KG)
Water Output 50/75
(t/h)
CLHG0.06-85/60-S
0.06
5
500
DN40
DN25
13.5
100
2
CLHG0.12-85/60-S
0.12
10
800
DN40
DN25
25
120
4
CLHG0.18-85/60-S
0.18
15
900
DN40
DN25
40
120
6
CLHG0.24-85/60-S
0.24
20
1300
DN50
DN40
54
130
8
CLHG0.35-85/60-S
0.35
30
1500
DN50
DN40
79
160
12
CLHG0.48-85/60-S
0.48
40
1800
DN65
DN40
106
230
16
CLHG0.60-85/60-S
0.60
50
2000
DN65
DN40
133
270
20
CLHG0.70-85/60-S
0.70
60
2100
DN80
DN40
158
350
24
CLHG1.05-85/60-S
1.05
90
2600
DN100
DN50
237
480
36
CLHG1.4-85/60-S
1.40
120
5500
DN125
DN50
316
480
48
CLHG2.1-85/60-S
2.10
180
7000
DN150
DN50
474
600
72
FAQ
1. How can you get the best price quickly?
(1) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
(2) Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
2. Why should you believe our boiler quality?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler;
(4).Hydrostatic test: ensure the standard working pressure and safety;
(5).Third-party inspection report:By Jiangsu Boiler Inspection Institute;
(6).Passed ISO:9001 ,ISO14001,OHASA18001 and ASME(S and U) and A-class boiler certificate.
4. Quality warranty
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed18
months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
5.Terms of payment
T/T 30% of total contract value as down payment;
T/T or L/C 70% of total contract value before delivery.
6.Claim
Any claims by the buyers regarding the machines shipped should be filed within 30 days after arrival of machines at the
destination specified in the relative B/L and supported by a survey report issued by a surveyor approved by the sellers, otherwise the sellers shall refuse to consider. Claims in respect of matters within responsibility of insurance company and/or shipping company will not be considered by the seller.
7. What is the using life of your boiler?
Normally the boiler is designed for 20 years life span, but with right operation and good maintenance, the boiler can be used for 20-25 years.
APP
Post My RFQ
WhatsApp
+86-17326049340