- Product Details
- {{item.text}}
Quick Details
-
Drilling depth:
-
3m(Sixth of a utility pole)
-
Auger drive mode:
-
Full hydraulic electric
-
Ascending mode:
-
Hydraulic lift
-
Standard drilling time:
-
10-60s
-
Applicable geological layer:
-
All geological layers
-
Cable trailer:
-
3T, 5T, 6T, 8T Optional
-
Certification:
-
CE, ISO
Quick Details
-
Place of Origin:
-
Shandong, China
-
After-sales Service Provided:
-
Video technical support, Online support, Free spare parts
-
Product name:
-
High Power Pile Driver For Excavator Election Pole Erection Machine
-
Drilling depth:
-
3m(Sixth of a utility pole)
-
Auger drive mode:
-
Full hydraulic electric
-
Ascending mode:
-
Hydraulic lift
-
Standard drilling time:
-
10-60s
-
Applicable geological layer:
-
All geological layers
-
Cable trailer:
-
3T, 5T, 6T, 8T Optional
-
Certification:
-
CE, ISO
Tractor Installed Pole Digging Drop Hammer Pile Driver for sale


Equipped with power (Loader) |
930 Manual gear $5200 | 4102 Engine, 56KW 6 forward gears(3 fast, 3 slow) 2 backward gears(1 fast, 1 slow) |
930 Automatic gear $5800 | 4102 Engine, 56KW 2 forward gears(1 fast, 1 slow) 2 backward gears(1 fast, 1 slow) | |
936 Manual or automatic gears $6200 | 4102 Engine, Turbocharged, 65KW 6 forward gears(3 fast, 3 slow) 2 backward gears(1 fast, 1 slow) | |
940 Automatic gear $7000 | 4105 or 4108 Engine, Turbocharged, 84KW | |
Pile driver price | $1800 (No hydraulic support leg) | |
$2400(Slide configuration and 2 Hydraulic support legs) | ||
Strong wind cooling | Yes, Standard configuration | |
No | ||
Drilling depth | 3m(Sixth of a utility pole) | |
Drilling diameter(cm) | 8m Telephone pole | 30cm |
12m | 40cm | |
15m | 45cm | |
18m | 50cm | |
Auger drive mode | Full hydraulic electric | |
Ascending mode | Hydraulic lift | |
Standard drilling time | 10-60s | |
Applicable geological layer | All geological layers | |
Cable trailer | 3T,5T,6T,8T Optional |
1. Drive system: Adopting high quality 4105 type turbocharged diesel engine, rated power up to 65kw, which assure more reliable power source for construction.
2. Hydraulic system: Advanced hydro system, high quality hydraulic element, and strictly assembly process, ensure the hydraulic system of high efficiency and durability. With 2000 N.m hydraulic oil pump driving force, which can maximally guarantee the working stability and durability of the pile driver.
3. Modeling design: Adopting homemade high quality crawler base, which is high strength, good stability, and in line with the industrial design idea of beauty, that ensure the solar spiral pile rig a bigger and comfort space for operator.
4. Production technics: More reasonable production process,after heat treatment wear-resist parts, strict welding process, make sure the rig less out of shape and more perfect performance.