- Product Details
- {{item.text}}
Quick Details
-
Dimension(L*W*H):
-
5800*1500*1000mm
-
Weight:
-
2500 KG
-
Application:
-
alluvial sand gold copper iron sand
-
Product name:
-
portable alluvial sand washing machine gold trommel screen
-
After sale service:
-
Life-long Service
-
Feeding size:
-
0-50mm
-
Capacity:
-
1-100tph
-
Certification:
-
ISO9001:2008
Quick Details
-
Place of Origin:
-
Henan, China
-
Brand Name:
-
HC
-
Voltage:
-
depends on customer requriements
-
Dimension(L*W*H):
-
5800*1500*1000mm
-
Weight:
-
2500 KG
-
Application:
-
alluvial sand gold copper iron sand
-
Product name:
-
portable alluvial sand washing machine gold trommel screen
-
After sale service:
-
Life-long Service
-
Feeding size:
-
0-50mm
-
Capacity:
-
1-100tph
-
Certification:
-
ISO9001:2008
Small Scale Mobile Gold Mining Trommel Plant For Recycling gold
Placer gold machine, placer gold beneficiation machinery as a mining, recovery of sand gold heavy metal machine is currently used in the global scope of sand gold mining areas. They come in many sizes, but they are all designed and made with the aim of recycling gold.
Working processing
The alluvial gold machine movement is very convenient and can be applied to a variety of terrain, terrain is soft sandy or hard rock, stone or more can be applied, and must also very convenient, can satisfy the development of mining while walking. This method has a good effect on a large range of sand gold mining areas, which can save more production costs and increase mining efficiency.
Application
Of
Small Scale Mobile Gold Mining Trommel Plant For Recycling gold
1. Input of raw materials Raw materials inputted through the entrance of the hopper will be pushed into the trommel screen by the
strong water pressure of the shower equipped in the hopper.
2. Selection and cleaning of raw materials Raw materials of the trommel screen will be cleaned and selected by the rotation of trommel screen and by watering of the shower inside, run into the gold dust separate panel.
3. Collecting of gold dust separated Soil and sands with lighter specific gravity will flow away but gold dusts with greater
specific gravity will be staying in the gathering mat to be collected.
1. Input of raw materials Raw materials inputted through the entrance of the hopper will be pushed into the trommel screen by the
strong water pressure of the shower equipped in the hopper.
2. Selection and cleaning of raw materials Raw materials of the trommel screen will be cleaned and selected by the rotation of trommel screen and by watering of the shower inside, run into the gold dust separate panel.
3. Collecting of gold dust separated Soil and sands with lighter specific gravity will flow away but gold dusts with greater
specific gravity will be staying in the gathering mat to be collected.
Model
|
Capacity
(t/h) |
Power
(kw) |
Diameter
(mm) |
Length
(mm) |
Discharge
(mm) |
Input
(mm) |
Dimension
(mm) |
YGTS1020
|
10-30
|
4.0
|
1000
|
2000
|
0-100
|
≤300
|
3390×1400×2140
|
YGTS1225
|
30-50
|
5.5
|
1200
|
2500
|
0-100
|
≤300
|
4146×1600×2680
|
YGTS1545
|
50-120
|
11
|
1500
|
4500
|
0-100
|
≤400
|
8160×2>300×2500
|
YGTS1548
|
80-150
|
11
|
1500
|
4800
|
0-100
|
≤400
|
8460×2300×2500
|
YGTS1848
|
100-200
|
15
|
1800
|
4800
|
0-100
|
≤400
|
8460×2300×2700
|
YGTS2060
|
200-350
|
30
|
2000
|
6000
|
0-100
|
≤400
|
9680×2300x3420
|
OUR WORKSHOP
We are a real manufacturer, not a trading company. We have the best after-sales service. The complete set of markene production is produced by ourselves, without the need to buy different machine connection product lines from different manufacturers.
Packing Details &Delivery Time
Packaging Details:
Standard export packing, Spare parts in wooden case, big machines loaded in container,large machines use nude packing, cover with plastic cloth. We export through QingdaoPort, also can be nominated by customer. We have superior cargo agent to arrange thesea shipment for each client, competitive price, secure transportation.
Delivery Time:
We will customize according to the actual needs of customers. Senior designers start to design the plan. After receiving the deposit, we will complete the delivery within 10 to 20
working days.
Hot Searches