- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
PC120 PC130 PC150 PC160 PC180 PC200
-
Condition:
-
New
-
Applicable Industries:
-
Construction,mining
-
Weight:
-
300 kg
-
Suitable Excavator(ton):
-
1-30tons
-
Core Components:
-
excavator attachment
-
part name:
-
Auger Drill Drive Excavator Attachment
-
Drill Hole Diameter:
-
100mm - 1200mm
-
Drill Hole Depth:
-
1m - 30m
-
Bit Type:
-
Tunsten/Rock/Sharp Teeth
-
Drilling Way:
-
Rotary
-
Power System:
-
Hydraulic System
-
Suitable Carrier:
-
1-30t
-
Application:
-
Post Hole Digging Machine
-
Teeth Type:
-
Tungsten/Rock/Sharp
-
Applied Equipment:
-
Excavator/Skid Steer Loader/Crane/Backhoe Loader
Quick Details
-
Marketing Type:
-
New Product 2023
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
HuiLian
-
Model Number:
-
PC120 PC130 PC150 PC160 PC180 PC200
-
Condition:
-
New
-
Applicable Industries:
-
Construction,mining
-
Weight:
-
300 kg
-
Suitable Excavator(ton):
-
1-30tons
-
Core Components:
-
excavator attachment
-
part name:
-
Auger Drill Drive Excavator Attachment
-
Drill Hole Diameter:
-
100mm - 1200mm
-
Drill Hole Depth:
-
1m - 30m
-
Bit Type:
-
Tunsten/Rock/Sharp Teeth
-
Drilling Way:
-
Rotary
-
Power System:
-
Hydraulic System
-
Suitable Carrier:
-
1-30t
-
Application:
-
Post Hole Digging Machine
-
Teeth Type:
-
Tungsten/Rock/Sharp
-
Applied Equipment:
-
Excavator/Skid Steer Loader/Crane/Backhoe Loader
Product Details
New PC120 PC130 PC150 PC160 PC180 PC200 Construction Machinery Attachments Parts 10-25 Tons Hydraulic Earth Drill Auger
Auger Drills
Adaptable to any type of mini excavator, excavator or backhoe loader. Also applicable to skidloaders, skid loaders, truck
cranes,agricultural booms, etc.
Very useful for any type of hole, from fencing to road crossing, from probing the soil to plantingplants. Models with widia peaks drill into asphalt and rocky soils. Speed and precision, a big advantage at your fingertips.
cranes,agricultural booms, etc.
Very useful for any type of hole, from fencing to road crossing, from probing the soil to plantingplants. Models with widia peaks drill into asphalt and rocky soils. Speed and precision, a big advantage at your fingertips.
Earth and drilling (Complete with Earth Teeth and Earth Pilot) Diameter: 100mm, 150mm, 200mm, 225mm, 250mm, 300mm, 350mm,400mm, 450mm, 500mm, 600mm, 750mm, 900mm etc
Auger Drill Specification
|
|
|
Size
|
Customized
|
|
Color
|
Customized
|
|
Feature
|
Wear-resisting durable
|
|
Technics
|
Heat treatment
|
|
Material
|
Alloy
|
|
Surface treatment
|
Spray paint
|
|
Application
|
Excavator
|
|
OEM
|
Accept
|
Manufacturing Technique
![](https://cdn.bestsuppliers.com/seo_products_img/gzseals/b32a804fbd2e3cb3915788527c87426e.jpg!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/gzseals/b9135a22075b3cb0903b15f64daf9175.jpg!/rotate/180)
Product Description
Auger Drive Model
|
|
|
|
|
|
|
|
|
||||||||
Model
|
Machine Weight
|
Torque
|
Pressure
|
Oil Flow Range
|
Hydraulic Hoses
|
Output Shaft
|
Depth
|
Unit Diamieter
|
||||||||
|
|
|
|
|
|
(STD)
|
|
|
||||||||
|
ton
|
nm
|
bar
|
l/m
|
bsp
|
mm/sq
|
m
|
mm
|
||||||||
HL30Z
|
1.5-3T
|
3500-400
|
80-140
|
70-120
|
1/2"
|
75
|
1-2M
|
180-300
|
||||||||
HL60Z
|
5-8T
|
5000-6300
|
80-180
|
70-150
|
1/2"
|
75
|
1-3M
|
180-600
|
||||||||
HL80Z
|
8-13T
|
7200-10000
|
80-180
|
70-150
|
1/2"
|
75
|
1-4M
|
180-800
|
||||||||
HL150Z
|
3-18T
|
12000-15000
|
80-260
|
80-170
|
1/2"
|
75
|
1-6M
|
180-1000
|
||||||||
HL200Z
|
18-26T
|
17000-20000
|
80-260
|
80-170
|
1/2"
|
95
|
1-7M
|
180-1000
|
Product Maintenance
1. Replacement of parts:
After the customer buys the auger, the original parts of the manufacturer should be used. Reducer gear oil check regularly.
2. pipeline:
When customers use auger, they should use special supporting pipes. When disassembling each time, they must ensure that the pipes and their joints are clean, so as to avoid accidental impurities brought into the disassembly and damage to the auger.
3. the use of hydraulic oil:
Before installing the auger, it is necessary to filter the hydraulic oil, clean the oil tank, and replace the oil on the excavator. The oil on the excavator should be replaced frequently according to the service life of the excavator.
4. gear oil:
The gear oil of the reducer must be inspected regularly, inspected once a month, replaced once every six months, and the oil height is equal to the inspection hole.
5. butter lubrication:
Every 4 hours (whichever comes first) : Fill lubricating oil, lubricate shaft pin and rotating gear once.
6.Oil Seal:
Every half year or 1000 hours (whichever comes first) : replace the hydraulic cylinder oil seal and motor oil seal once. Do not replace the oil seal after the specified period.
After the customer buys the auger, the original parts of the manufacturer should be used. Reducer gear oil check regularly.
2. pipeline:
When customers use auger, they should use special supporting pipes. When disassembling each time, they must ensure that the pipes and their joints are clean, so as to avoid accidental impurities brought into the disassembly and damage to the auger.
3. the use of hydraulic oil:
Before installing the auger, it is necessary to filter the hydraulic oil, clean the oil tank, and replace the oil on the excavator. The oil on the excavator should be replaced frequently according to the service life of the excavator.
4. gear oil:
The gear oil of the reducer must be inspected regularly, inspected once a month, replaced once every six months, and the oil height is equal to the inspection hole.
5. butter lubrication:
Every 4 hours (whichever comes first) : Fill lubricating oil, lubricate shaft pin and rotating gear once.
6.Oil Seal:
Every half year or 1000 hours (whichever comes first) : replace the hydraulic cylinder oil seal and motor oil seal once. Do not replace the oil seal after the specified period.
![](https://cdn.bestsuppliers.com/seo_products_img/gzseals/291f0603f8383875a4a8a0d9f2982727.png!/rotate/180)
![](https://cdn.bestsuppliers.com/seo_products_img/gzseals/e335dfdbd5e63887991ccfe4847ec3fe.jpg!/rotate/180)
Related Products
Hot Searches