- Product Details
- {{item.text}}
Quick Details
-
Place of Origin:
-
China
-
Brand Name:
-
SIRUI
-
Voltage:
-
220V/380V
-
Dimension(L*W*H):
-
2000*1700*2000mm
-
Weight (KG):
-
600 KG
-
Processing Type:
-
Cutting Machine
-
Certification:
-
ce
-
After-sales Service Provided:
-
Engineers available to service machinery overseas
-
Application:
-
Sponge vertical cutting
-
Product Name:
-
Vertical sponge cutting machine (small)
-
Feature:
-
High Efficiency
-
Control system:
-
Manual
-
Blade length:
-
4620mm
-
Cutting sponge height:
-
600mm
-
Function:
-
Foam Strip Cutting Slitting Stacking
Quick Details
-
Max.Product Size(L)(mm):
-
1000 mm
-
Max.Product Size(W)(mm):
-
1000 mm
-
Max.Product Size(H)(mm):
-
600 mm
-
Place of Origin:
-
China
-
Brand Name:
-
SIRUI
-
Voltage:
-
220V/380V
-
Dimension(L*W*H):
-
2000*1700*2000mm
-
Weight (KG):
-
600 KG
-
Processing Type:
-
Cutting Machine
-
Certification:
-
ce
-
After-sales Service Provided:
-
Engineers available to service machinery overseas
-
Application:
-
Sponge vertical cutting
-
Product Name:
-
Vertical sponge cutting machine (small)
-
Feature:
-
High Efficiency
-
Control system:
-
Manual
-
Blade length:
-
4620mm
-
Cutting sponge height:
-
600mm
-
Function:
-
Foam Strip Cutting Slitting Stacking
Products Description
This machine is mostly used for small sponge vertical cutting and processing all kinds of EVA,EPE, packaging materials,paper and other products.
Product Paramenters
Model
|
SR-V01
|
In worktable size
|
W490*L1000mm
|
Outer worktable size
|
W1000*L1000mm
|
Cutting spinge thickness
|
2- mm
|
Worktable turning speed
|
0-30m/min
|
Blade length
|
4620mm
|
Total power
|
1.68kw
|
Machine external size
|
L2000*W1700*H2000mm
|
Details Images


Certifications


Product packaging
Our Advantages
1)After-sales Service:
Our engineers is avilable to oversea for coordinate installation, commissioning and training.
Cost for flight and suitable accommodation plus USD 100 per day each person will be charged additionally.
Our engineers is avilable to oversea for coordinate installation, commissioning and training.
Cost for flight and suitable accommodation plus USD 100 per day each person will be charged additionally.
2)Free training course at our plant.
3)24 hours on line service each day; free technical support.
4)Machine has been adjusted and test before delivery.
5)Free to design the Layout of customers' plant by our technician team.
3)24 hours on line service each day; free technical support.
4)Machine has been adjusted and test before delivery.
5)Free to design the Layout of customers' plant by our technician team.
FAQ
Q1: What’s the warranty year of machines?
A1: One Year, except for the wearing parts.
Q2: What’s the delivery date?
About 20 to 90 days after received the deposit.
Q3: How to guarantee the machine quality?
A3: Our professional technicians will do repeated tests and adjustments to ensure that the quality of the machine is the best.
Q4: How to install and operate the machine after received the machine?
A4: We will provide pictures, videos and manual to guide you to install and operate. We also provide the technician to doorservice if you need.
A1: One Year, except for the wearing parts.
Q2: What’s the delivery date?
About 20 to 90 days after received the deposit.
Q3: How to guarantee the machine quality?
A3: Our professional technicians will do repeated tests and adjustments to ensure that the quality of the machine is the best.
Q4: How to install and operate the machine after received the machine?
A4: We will provide pictures, videos and manual to guide you to install and operate. We also provide the technician to doorservice if you need.
Q5:For the cost of the engineer how much I need to pay?
A5:You need to pay USD100 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
A5:You need to pay USD100 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q6: How to solve the problem during the use of machine?
A6: If any questions during the use, please send us the description of problem together with pictures or videos,our professional after-sales team will reply you immediately.
A6: If any questions during the use, please send us the description of problem together with pictures or videos,our professional after-sales team will reply you immediately.
Hot Searches