- Product Details
- {{item.text}}
Quick Details
-
Model Number:
-
lwwww
-
Brand Name:
-
leqian
-
Product name:
-
refrigeration service valve Air Conditioning Fitting
-
for:
-
beer ,co2
-
Thread:
-
BSPP as drawing
-
Pressure Gauge:
-
6000psi
-
Advantage:
-
Customized Service Provided
-
Process:
-
Casting +Machining(if Need)+surface Treatment
-
Input Pressure:
-
4500psi
-
Style:
-
Casting
Quick Details
-
Warranty:
-
3 years
-
Type:
-
Valve Bodies
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
lwwww
-
Brand Name:
-
leqian
-
Product name:
-
refrigeration service valve Air Conditioning Fitting
-
for:
-
beer ,co2
-
Thread:
-
BSPP as drawing
-
Pressure Gauge:
-
6000psi
-
Advantage:
-
Customized Service Provided
-
Process:
-
Casting +Machining(if Need)+surface Treatment
-
Input Pressure:
-
4500psi
-
Style:
-
Casting
PCP Filling Station Service Valve Compressor refrigeration service valve Air Conditioning Fitting
we have not same valve ,but we can make as your sample or drawing
- adapter used on most newer R410A ductless mini split systems. Perfectly fits for mini split system air conditioners, HVAC and refrigeration service.
- [FUNCTION] Useful adapter, converts the 5/16 inch SAE charging-vacuum ports to accept 1/4 inch SAE gauge-hose set; 1/4 Inch male SAE x 5/16 inch SAE female adapter.
- [45 DEGREE ADAPTER] The coupler nuts are deeply knurled for quick finger-tightening. With 45° angle on the service port site for easier access.
- [PREMIUM QUALITY] Adapters are made from heavy duty brass material and well-tested by the manufacturer, quick connect, good tensile strength and resisting corrosion. The r134a hose gaskets made of rubber, proof leaking correctly.
Product name | PCP Filling Station Valve Charging Adapter to 58 Adapter Valve 300 bar pcp |
material | 304 stainless steel |
Test Pressure | 0~16 Bar |
Working Pressure | 0~16 Bar |
Application |
1.Applicable for extreme high and low temperatures.
3. used for vacuum lines. 4. used for gas analyzer lines when high accuracy is required. |
Photos for
PCP Filling Station Service Valve Compressor refrigeration service valve Air Conditioning Fitting
1)Communication: customers interest in our products , discuss price , check sample quality
2)Negotiation : talking about the sizes, quantity , and other details
3)Ordering: settle down and place order to us
4)Producing: after orders , we start productions at once
5)Packing: while products come out of machines then packed
6)Delivery : everything gets ready ,place the ship, send to dock , to be shipped
1>100% QC inspeciton
2>drawing if need to creat
3>quotation as soon as possible
4>one-stop service :quote,drawing,material ,mass production ,casting,checking ,package ,shipping
Material Available
|
|||||
Aluminum
|
Stainless Steel
|
Brass
|
Copper
|
Plastic
|
Iron
|
AL6061
|
SS201
|
C35600
|
C11000
|
POM
|
20#
|
AL6063
|
SS301
|
C36000
|
C12000
|
Peek
|
45#
|
AL6082
|
SS303
|
C37700
|
C12200
|
PMMA
|
Q235
|
AL7075
|
SS304
|
C37000
|
C10100
|
ABS
|
Q345B
|
AL2024
|
SS316
|
C37100
|
etc
|
Delrin
|
Q345B
|
AL5052
|
SS416
|
C28000
|
|
Nylon
|
1214/1215
|
FAQ
Question1: Did you accept products customization? Do they need mould fee?
Answer: Yes, we accept products customization. Need mould fee, because products usually need extra mould cost. But we can return the mould fee when you reach a specific quantity.
Question2: Can we get free samples?
Answer: The sample expense and freight expense will be borne by the buyers, and will be returned in the following orders.
Question3: How long is the normal production period for a 20-foot shipping container?
Answer: According to the current productive capacity, usually needs 3-14 days from producing to delivery.
Question4: What is the type of payment?
Answer: Usually you should prepay 30% of the total amount. The balance should be paid before delivery.
Question5: How to guarantee the high quality?
Answer: We have testing department to make sure quality of every product, appearance and pressure test are good.