Products
Mining spray sealed tank polyurethane foam 2 tank spray system
Mining spray sealed tank polyurethane foam 2 tank spray system
Mining spray sealed tank polyurethane foam 2 tank spray system
Mining spray sealed tank polyurethane foam 2 tank spray system
Mining spray sealed tank polyurethane foam 2 tank spray system
Mining spray sealed tank polyurethane foam 2 tank spray system
Mining spray sealed tank polyurethane foam 2 tank spray system
Mining spray sealed tank polyurethane foam 2 tank spray system

Mining spray sealed tank polyurethane foam 2 tank spray system

FOB Reference Price: Get Latest Price
≥1 Pieces
US $135
≥10 Pieces
US $120
≥100 Pieces
US $95
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Voltage:
220V/380V
Weight (KG):
18 KG
Product Name:
polyurethane foam spray tank
Bonding strength:
2-4 Mpa
Cure time:
5-20 s
Expansion number:
20-50
10% compressive strength:
≥1Mpa
Spraying area:
10-20 (㎡)
Elongation at break:
≥10%

Quick Details

Place of Origin:
Shandong, China
Brand Name:
GEE VICTORY
Machine Type:
polyurethane foam spray tank
Voltage:
220V/380V
Weight (KG):
18 KG
Product Name:
polyurethane foam spray tank
Bonding strength:
2-4 Mpa
Cure time:
5-20 s
Expansion number:
20-50
10% compressive strength:
≥1Mpa
Spraying area:
10-20 (㎡)
Elongation at break:
≥10%
Specification
Polyurethane foaming equipment with advanced technology ensures stable mixing pressure of two-component raw materials. The use of an independent heating system and high-precision computer temperature control solves the problem of raw materials affecting the normal use of the equipment due to changes in external temperature. The shutdown reset function extends the service life of the sealing ring, thereby ensuring the working stability of the equipment. The overall structure of polyurethane spraying equipment is compact, easy to use, simple to operate, low failure rate, and long service life of components.
Indicator items
parameter
Bond strength
2-4MPa
10% compressive strength
≥1Mpa
Elongation at break
≥10%
Closed space
≥98%
Spraying area
10-20㎡
Expansion number
20-50
Curing time
5-20 s
Solid density
35-45Kg/m3
Weight
18±1Kg
Storage Conditions
Store at room temperature
Shelf life (normal temperature)
≥6 months
Flame retardant properties
Flame retardant (V-0)
Product Description

Instructions for use

1. Mix the materials in the container thoroughly. Keep the tank level after using it for more than half of the time. 2. The user should wear gloves and goggles to ensure protection. 3. Connect the spray gun, pipe and nozzle before use; unscrew the valves of containers A and B (turn counterclockwise). The degree of unscrewing of the tank valve affects the spraying pressure of the material. The pressure should be equal and moderate; opening it all at the beginning can achieve the best spraying effect. (Note: Some valves have safety locks that require pressing the valve to open) 4. After opening the valve, first check the discharging conditions of the two groups of materials, pull the triggers respectively to adjust the pressure of the two groups of materials, then hold the spray gun with the muzzle 1 meter away from the target, and pull the two triggers at the same time for multi-directional spraying . 5. Preventive and regular surfaces should be sprayed evenly with a thickness of 0.5 cm, the best; gas leakage points and irregularities should be sprayed intensively, and the sprayed surface should be uniform after curing: spraying should follow the principle of small amounts and multiple times to achieve bonding. most effective 6. If there is an interval during the spraying process, the interval should be ≤1 minute. If the interval is long, the trigger needs to be pulled intermittently to prevent the gun head from being blocked; once the tank is opened, it is best to use it within one day to avoid the main material solidifying in the feeding pipe and affecting the normal use of the system. If a tank with unused material needs to be stored for a short period of time, the tank valve should be closed first, and then the trigger should be pulled to fully drain the remaining material in the feeding pipe. Finally, replace the gun head.
Certifications
Packing & Delivery
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
After sales service
APP
Post My RFQ
WhatsApp
+86-17326049340