Explore More Products
- Product Details
- {{item.text}}
Quick Details
-
Voltage:
-
48V
-
Power Supply:
-
lithium battery
-
Braking System:
-
Rear Wheal Disc Brake
-
Battery Capacity:
-
9.5 AH
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
Qiangsheng
-
Model Number:
-
QS-TD1
-
Motor:
-
Brushless
-
Foldable:
-
NO
-
Motor Power:
-
350W
-
Controller:
-
Sine Wave
-
Battery:
-
48V 12 /20ah li battery or gel battery
-
Brake System:
-
Drum Brake
-
Charger:
-
AC 100V-240V
-
Charging time:
-
4-6 Hours
-
Max load:
-
150kgs
Quick Details
-
Gears:
-
6 Speed
-
Frame Material:
-
Steel
-
Wheel Size:
-
14"
-
Voltage:
-
48V
-
Power Supply:
-
lithium battery
-
Braking System:
-
Rear Wheal Disc Brake
-
Battery Capacity:
-
9.5 AH
-
Place of Origin:
-
Hebei, China
-
Brand Name:
-
Qiangsheng
-
Model Number:
-
QS-TD1
-
Motor:
-
Brushless
-
Foldable:
-
NO
-
Motor Power:
-
350W
-
Controller:
-
Sine Wave
-
Battery:
-
48V 12 /20ah li battery or gel battery
-
Brake System:
-
Drum Brake
-
Charger:
-
AC 100V-240V
-
Charging time:
-
4-6 Hours
-
Max load:
-
150kgs
Hot-sale product
PRODUCT INFORMATION
Place of Origin: | China |
China: | Hebei |
Brand Name: | Qiangsheng |
Model Number: | QS-TD1 |
Gears: | 6 Speed |
Range per Power: | 10 - 30 km |
Frame Material: | Steel |
Wheel Size: | 14" |
Max Speed: | <30km/h |
Voltage: | 48V |
Power Supply: | Storage Battery |
Braking System: | Rear Wheal Disc Brake |
Motor position: | Rear Hub Motor |
Battery Position: | Down Tube |
Battery Capacity: | 9.5 AH |
Smart Type: | Electronic |
Motor: | Brushless |
Foldable: | NO |
Motor Power: | 350W |
Controller: | Sine Wave |
Battery: | 48V 12 /20ah li battery or gel battery |
Brake System: | Drum Brake |
Charger: | AC 100V-240V |
Charging time: | 4-6 Hours |
Max load: | 150kgs |
Product Display
WHY CHOOSE US
FAQ
1.Are your company a trading one or a factory?
Factory + trade (mainly factories, so the quality can be ensured and price competitive)
2.How long have your company run on electric bicycle?
More than 10 years focusing on electric bicycle, and more than 7 years exporting experience.
3,Which payment terms are you accept?
Payment Terms: T/T, or cash
4.After an order is placed, when to deliver?
it will be decided by the time of the factory production and your quantity.Normally around 15-20 days.
5.If the products are not conformity with requirements, how to solve?
If the products are not conform to customer samples or have quality problems, our company will be responsible for it.
6.What about the cooperation process?
Confirm details of order, 30% deposit, Arrange production, pay the balance, shipment.
Hot Searches