Products
Two Component Polyurethane Adhesive Artificial Grass Installation Glue
Two Component Polyurethane Adhesive Artificial Grass Installation Glue
Two Component Polyurethane Adhesive Artificial Grass Installation Glue
Two Component Polyurethane Adhesive Artificial Grass Installation Glue
Two Component Polyurethane Adhesive Artificial Grass Installation Glue
Two Component Polyurethane Adhesive Artificial Grass Installation Glue

Two Component Polyurethane Adhesive Artificial Grass Installation Glue

FOB Reference Price: Get Latest Price
≥1 Pieces
US $60
≥10 Pieces
US $55
≥20 Pieces
US $45
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Mixing Ratio:
A:B=9:1
Packing:
A: 9KGS/bucket;B: 1KG/bottle
Solid Content:
100%
Open Time:
45 Minutes
Curing time:
4 Days
Warranty:
12 months
Suitable Temperature:
0℃ ~ 35℃

Quick Details

CAS No.:
9009-54-5
Place of Origin:
Beijing, China
Application:
Artificial Grass Installation
Mixing Ratio:
A:B=9:1
Packing:
A: 9KGS/bucket;B: 1KG/bottle
Solid Content:
100%
Open Time:
45 Minutes
Curing time:
4 Days
Warranty:
12 months
Suitable Temperature:
0℃ ~ 35℃

Bi-Component Polyurethane Artificial Grass Installation Adhesive:

1.  Preparing Work

a. Substrates Preparation

According to the synthetic grass usage, substrates must be prepared according to current regulations and standards.

b. Synthetic Grass Preparation

Unroll and spread out the synthetic grass for several hours before starting installation to allow internal tension caused by the packaging to be reduced.

c. Adhesive Preparation

The Adhesive should be placed under room temperature in advance. Do not use the adhesive below 0℃, or higher than 35℃.

2. Mixing Ratio

Flexibond 8265: Flexibond 8200=9:1 by weight

The adhesive is packed as Component A 9kg and Component B 1kg already(Above Picture) . Pour Component B Flexibond 8200 into the barrel containing Component A Flexibond 8265 when use the adhesive. When mixing adhesive of other weight, mixing ratio should be strictly follow 9:1 by weight. Stir with low speed mixer for 2-3 minutes till the adhesive achieves uniform colored paste.

3. Application time

The adhesive open time is around 30 minutes (23℃). The higher the temperature is, the shorter the open time is; the lower the temperature is, the longer the open time is. Under high temperature, the adhesive should be coated as soon as possible.

4.  Adhesive Coated and Synthetic Grass Installation

Well mixed adhesive is uniform thixotropic paste which effectively increases its contact area with grass. It is ok to coat the adhesive once.

Apply the adhesive onto special jointing strip with tooth trowel (picture 2, 4mm*4mm type) or simple machine (picture 3).

picture 2 Picture 3

Install the synthetic grass onto the jointing tape before adhesive tack free. In order to achieve good adhesion and evenness, heavy stuff can be putted onto the jointing place. Adhesive open time is around 60 minutes under temperature 23℃. The open time is shortened if temperature rising.

5. P ressing time

Adhesive initially cures in 2 hours under 23℃, sets to light foot traffic in 12 hours, and cures completely in 7 days. The higher the temperature is, the shorter the curing is; the lower the temperature is, the longer the curing is.

6.  Consumption

Approximately 0.4kg-0.5kg per meter of 30 cm-wide jointing strip.

INSTALLATIONS:

Factory Photos

Certificates

Sales team

APP
Post My RFQ
WhatsApp
+86-17326049340