Products
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall
LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall

LIANGGONG Single Side Cantilever Climbing Formwork for House/ Pier/Shear Wall

FOB Reference Price: Get Latest Price
≥20 Sets
US $1300
≥50 Sets
US $460
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Application:
Shear Wall /Bridge Pier, High Rise Buildings
Design Style:
Modern
Type:
Climbing formwork
Place of Origin:
Jiangsu, China
Brand Name:
LIANGGONG
Model Number:
Climbing formwork
Color:
Red,Blue, Or Customized
Certificate:
ISO9001:2008
Origin:
Jiangsu, China (Mainland)
Advantage:
Easy Operation Quick climbing and high saftly Coefficient
Material:
Steel, Timber Beam H20
Height of Bracket:
10-15 meters
Number of Platform:
4-7
Keywords:
Concrete Formwork
Packing:
Pallet Packing

Quick Details

Warranty:
1 Year
After-sale Service:
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection
Project Solution Capability:
graphic design, 3D model design, total solution for projects
Application:
Shear Wall /Bridge Pier, High Rise Buildings
Design Style:
Modern
Type:
Climbing formwork
Place of Origin:
Jiangsu, China
Brand Name:
LIANGGONG
Model Number:
Climbing formwork
Color:
Red,Blue, Or Customized
Certificate:
ISO9001:2008
Origin:
Jiangsu, China (Mainland)
Advantage:
Easy Operation Quick climbing and high saftly Coefficient
Material:
Steel, Timber Beam H20
Height of Bracket:
10-15 meters
Number of Platform:
4-7
Keywords:
Concrete Formwork
Packing:
Pallet Packing
Product Description


Single-side Climbing Bracket

CB180   &C B240

With FWK LIANG GONG CB180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.Typical applications for the CB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.

They are framework brackets for supporting large-area wall formwork.
Typical applications for the CB240 are pier and column /shear wall/core wall / in the building.

Product Show
Characteristics


Characteristics of Climbing Bracket CB180


●Economical and safe anchoring


The M30/D20 climbing cones have been designed especially for single-sided concreting using CB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

Stable and cost-effective for high loads


Generous bracket spacings allow large-area formwork units with optimal utilization of the bearing capacity. This leads to extremely economical solutions.

●Simple and flexible planning


With CB180 single-sided climbing formwork, circular structures can also be concreted without undergoing any large planning process. Even use on inclined walls is feasible without any special measures because additional concrete loads or lifting forces can be safely transferred into the structure.


Characteristics of Climbing Bracket CB240


● High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

Simple moving procedure by crane

Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

Fast striking process without a crane

With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

● Safe with work platform


The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.

Packing & Delivery
Packing Details
Package Box, Steel Pallet, Steel Frame, Container
Delivery Details
Generally it is 5-30 days, it is according to quantity.
Port
Shanghai
Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection

Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment

From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction

If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company


Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.


During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.

Customer Photo
FAQ
Q1: Are you trading company or manufacturer ? A: We are manufacturer. Q2. What do you do? A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc. Q3: Do you provide samples ? is it free or extra ? A: Yes, we could offer the sample for free charge but do not pay the cost of freight. Q4. What can you do for us? A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects. B.We sell our products to the contractors, building companies, material supplier or trading companies. C.We support our worldwide peer companies with our outstanding formwork or scaffolding products. D.We provide remote or on-site instruction to the builders. Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built? A: Structural drawing and section drawing. Q6. How long does it take to make a brief design and quotation after we offer the structural drawing? A: In general, it takes 5~7 days based on specific requirements of construction project. Q7. How long dose it take to manufacture the products after the signing of contract? A: In general, it takes 30~60 days based on the type and quantity of products to be produced. Q8: What is your terms of payment ? A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
APP
Post My RFQ
WhatsApp
+86-17326049340