- Product Details
- {{item.text}}
Quick Details
Quick Details
-
Max. Voltage:
-
180-250V
-
Place of Origin:
-
wenzhou,china
-
Brand Name:
-
jieyue
Products Description
smart switching power supply energy saving smart hotel power switch
Hotel card insertion and power switch
Model: P3
Low frequency power supply: 125HZ suitable for TEMIC (T5557), EM4100EM4305, ID card
High frequency power supply: 13.56MHZ suitable for high-frequency induction cards such as M1
Any card charging: Any card
Working voltage: AC: 110/220V DC: 5/12V Other voltages can be customized
Rated load: 8800W
Static power: 0.3W
Delay standard: 8-12s
Working temperature: 0 ℃~50 ℃
Working humidity: 0-90% RH
Environment: Transportation and storage temperature range -20 ℃~80 ℃
Installation: Standard 86 bottom box left and right installation
External dimensions: 86x86mm
Regular colors: white, black, silver gray, gold, other colors can be customized.
Bottom box height: 39mm (ultra small, easy to install)
Wiring method: zero, fire
Support OEM color logo customization!
Welcome to consult customer service!
item
|
value
|
Product name
|
switching power supply
|
Feature
|
Energy saving
|
WorkingVoltage
|
220V
|
Rated Currrent
|
40A
|
Working Temperature
|
-25 ~70℃
|




FAQ
Most asked questions by our partners
Q:Who are you?
A: We are a professional supplier of electronic components from Zhejiang Yueqing.we can offer the most competitive price.
A: We are a professional supplier of electronic components from Zhejiang Yueqing.we can offer the most competitive price.
Q: Are you manufacturer or just dealer?
A: We're manufaturer, we do produce all products by ourself. Welcome to visit our plant at any time. Q: How about your quality control?
A: All the products will be 100% checked before the shipment.
A: We're manufaturer, we do produce all products by ourself. Welcome to visit our plant at any time. Q: How about your quality control?
A: All the products will be 100% checked before the shipment.
Q: I couldn't find the products I want in your catalogue, can you develop it for me?
A: Yes. we have a research & development dept. Q:What are your terms of payment?
A: Order $1000 + T/T, 30% deposit to arrange shipment. The remaining 70% is paid before shipping.
A: Yes. we have a research & development dept. Q:What are your terms of payment?
A: Order $1000 + T/T, 30% deposit to arrange shipment. The remaining 70% is paid before shipping.
Q: How long is the lead time?
A: Normally we keep stock for most products, the lead time is 1-5 days as soon as the payment is released.
For customized products, it takes longer.
A: Normally we keep stock for most products, the lead time is 1-5 days as soon as the payment is released.
For customized products, it takes longer.
Q: How could I get a sample?
A: Free sample,you can take it from our office by your express delivery or pay express fee to us to send you. Q: Can we ask for support if we run into trouble?
A: Of course, if there are any quality issues or problems; We can provide technical support or return services. Q: Shipping
A: UPS / Fedex / DHL / TNT / EMS. or pls contact us directly which way your pre ferred.
A: Free sample,you can take it from our office by your express delivery or pay express fee to us to send you. Q: Can we ask for support if we run into trouble?
A: Of course, if there are any quality issues or problems; We can provide technical support or return services. Q: Shipping
A: UPS / Fedex / DHL / TNT / EMS. or pls contact us directly which way your pre ferred.
Hot Searches