Explore More Products
- Product Details
- {{item.text}}
Quick Details
-
Feature:
-
Boil-Dry Protection
-
Automatic Shut-off:
-
Yes
-
Capacity:
-
6, 4.5L~20L
-
Power:
-
1600
-
Voltage:
-
220
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
HN1300
-
Brand Name:
-
HUINING
-
Control Type:
-
Other
-
Name:
-
Water boiler/Coffee urn
-
Metal:
-
S/S 304#,S/S 201# and S/S 430# stailess steel
-
Type:
-
electric hot water boiler for for hotel and catering
-
Certification:
-
CE
-
Double safety:
-
Fuse and tempreture contorller inside the bottom
-
Special function:
-
Keep warm function
-
With ERP test:
-
Comply with European ERP instruction
-
New function:
-
Auto shut-off
-
Sample time:
-
3-5 Days
Quick Details
-
Warranty:
-
1 Year
-
Application:
-
Hotel, Commercial, Household
-
Material:
-
Stainless steel
-
Feature:
-
Boil-Dry Protection
-
Automatic Shut-off:
-
Yes
-
Capacity:
-
6, 4.5L~20L
-
Power:
-
1600
-
Voltage:
-
220
-
Place of Origin:
-
Guangdong, China
-
Model Number:
-
HN1300
-
Brand Name:
-
HUINING
-
Control Type:
-
Other
-
Name:
-
Water boiler/Coffee urn
-
Metal:
-
S/S 304#,S/S 201# and S/S 430# stailess steel
-
Type:
-
electric hot water boiler for for hotel and catering
-
Certification:
-
CE
-
Double safety:
-
Fuse and tempreture contorller inside the bottom
-
Special function:
-
Keep warm function
-
With ERP test:
-
Comply with European ERP instruction
-
New function:
-
Auto shut-off
-
Sample time:
-
3-5 Days



customized hot water boiler for hotel, electric drinks water boiler, electric kettle
Long-life concealed element
Sturdy non-drip tap, preventing scalding from water drips
Condensation-return lid design with steam vent and twist lock mechanism
Sight-glass water level indicator
Boil dry protection
Handles on all models

Product
|
hot water boiler
|
Material
|
stainless steel
|
To Make Coffee
1. To make coffee, remove cover, coffee basket and stem. Fill coffee urn with cold water to desired level as indicated by
numbered servings on inside of urn.
2. Place stem into coffee basket. Then holding the center post of the coffee basket place large end of stem into heating unit well.
3. Measure ground coffee into coffee basket. Avoid getting ground coffee in the stem. Refer to the Coffee Making Chart that follows. Spread coffee evenly in basket.
5. Plug cord into the coffee urn then plug the cord into electrical outlet. The unit automatically turns on.
6. The coffee urn will stop automatically when the coffee has finished brewing, and the Ready light will glow. Allow about 1 minute per cup for brewing time.
7. Using a hot mitt, remove cover then carefully remove coffee basket with HOT grounds and stem. Replace cover.
8. The coffee urn will remain at serving temperature until it is unplugged. To serve, place a cup under the serving spout.
Push down and hold the lever until the cup is filled, then release the lever. For a constant flow, to empty the urn, or
fill a carafe, lift the lever straight up. The lever will stay in the open position until the lever is pushed down.
9. When finished serving coffee, unplug the coffee urn from the electrical outlet. Then remove cord from the coffee urn.
To Heat Water
Use heated water to make instant coffee, hot cocoa, or tea.
1. To heat water, remove cover, coffee basket and stem. Fill coffee urn with cold water to desired level as indicated by numbered servings on inside of coffee urn.
2. Place stem into coffee basket then place large end of stem into heating unit well. (Using the stem and basket will speed heating time.)
3. Place cover onto coffee urn and turn to lock. Plug in coffee urn and let go through complete perk cycle. Water is hot
when the Ready light glows.
Plastic Fielter
Stainless Steel Fielter
1. Twist the fixed screw. 2. Pull out the power connection.
3. Take down the fuse fixed clip. 4. Replace the power supply leads combination.
5. Fixed new fuse. (supply leads combination) 6. Inner parts inspection (see next page).
Anhui Huining International Trade Co.,Ltd. is a professional manufacturer and supplier of electric appliances and commercial kitchen appliances. Based on 15 years experience in this field, we can offer customers the top quality and innovative products. In addition, we use stringent quality control measures to ensure the reliability of our products. With sound business credit, excellent after-sales service, and modern manufacturing facilities, we have earned an excellent reputation among our global customers.
We have our own two factories each located in Zhejiang and Guangdong province, in which we have 10000 square meters workshop, more than 100 professional designer, quality control team and qualified workers. The enterprises has obtained IS0 9001 certificates, Most of our products has obtain CE,GS, LFGB, ROHS, REACH approval.
Q: Can I get some samples?
A:
Yes,Sample Orders Welcomed.
Q: Have goods 100% assembled well in stock?
A:
No,all goods will be newly produced according to your order.
Q: Could I use my own LOGO on goods?
A:
Yes, Customized logo on mass production are available.
Q: What is the delivery time?
A:
A week for sample,30-45 days for mass production.
Q: What is payment team?
A:
T/T,L/C at sight,Western Union,Paypal,etc.
Q: Why should I choose you?
A:
We are "Alibaba" verified supplier and we have over 15 years experience in this field.
Q: May I visit your company?
A:
Sure, welcome.