Products
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers
Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers

Price Meter Junction Iron Aluminum Steel Distribution Control Switch Panel Types Waterproof Cover Metal Electrical Box Suppliers

FOB Reference Price: Get Latest Price
≥1 Pieces
US $30
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Brand Name:
OEM ODM
Model Number:
OEM ODM
Product Name:
Metal Electrical Box
Material:
Metal
Thickness:
0.5mm-20mm Depends on your products
Specification:
Customized According to your drawings
High Precision::
+/-0.1mm
Drawing File::
2D:DWG,DXF,PDF 3D:ASM,IGS,STEP,STP .ETC
process:
Laser Cutting/Shearing/Punching/Bending/Welding/Coating/Others
Surface Treatment:
Available
Processing Equipment:
German and Japanese machines
Certificate:
ISO

Quick Details

Protection Level:
IP66
Type:
DISTRIBUTION BOX
Place of Origin:
Liaoning, China
Brand Name:
OEM ODM
Model Number:
OEM ODM
Product Name:
Metal Electrical Box
Material:
Metal
Thickness:
0.5mm-20mm Depends on your products
Specification:
Customized According to your drawings
High Precision::
+/-0.1mm
Drawing File::
2D:DWG,DXF,PDF 3D:ASM,IGS,STEP,STP .ETC
process:
Laser Cutting/Shearing/Punching/Bending/Welding/Coating/Others
Surface Treatment:
Available
Processing Equipment:
German and Japanese machines
Certificate:
ISO

Item Name

M etal electrical box

Material

Aluminum,Carbon steel,Mild steel,Cold roll steel,Hot roll steel
Stainless steel,SECC,SGCC,SPCC,SPHC,Other metal

Thickness

0.5mm-20mm
Depends on your products

Size

Customized
According to your drawings

High Precision

+/- 0.1mm

Surface treatment

Powder coating
Nickel plating,Anodic oxidation
Chrome plating,Yellow zinc plated
Electroless nickel plating
Chemical conversion coating
Zinc plating,Electroplating  .ETC

Manufacture

Laser Cutting/Shearing/Punching/Bending/Welding/Coating/Others

Drawing File

2D:DWG,DXF,PDF
3D:ASM,IGS,STEP,STP .ETC

Certificate

ISO    SGS

RELATED PRODUCTS

OUR ADVANTAGE

COMPANY PROFILE
OUR CERTIFICATE

PACKING&DELIVERY

FAQ

Q: Are you trading company or manufacturer ?
A: We are Factory, Mainly processing customized sheet metal products.

Q: How soon can I get your response?
A: our company rules that we must reply customers withim 24hours .Our current average response time is 4.3 hours.
stainless steel roll fabrication
Q: How soon can I get your quotation?
A: We are trying to quote you withim 24hours,however,it depends on drawings quantity and complicating rate.if you are really very urgent,call us or email us so that we will put it in priority.
rolling a sheet metal cone   metal fabrication     fabricated metal
Q: How can I get a sample for quality check?
A: After quotation,if needed,you can ask for samples to check quality.We will provide you free samples(value under 20 without tooling invest) as long as you pay freight cost by yourself.
steel fabricator   fabrication stainless steel    sheet metal fabrication
Q: What's your leading time for mass production? cone sheet metal   sheet metal fabrication
A: Laser cutting service ,normally 1-3 days are needed.
Custom metal parts,normally 2-7 days are needed.
Equipment&Instrument Shell, normally 7-30 days are needed.
Integral Machine machining,normally 20-50 days are needed.
Of course,order quantity is an very important element for leading time.
sheet metal fabricating   steel fabrication   metall cone
Q: What is your terms of payment ?
A: Payment≤1000USD, 100% in advance. Payment≥1000USD, 30% T/T in advance ,balance before shippment.

Q: Can you design drawings for us?
A: Yes, we have a professional engineer design team.
metal cone   sheet metal cones    stainless steel fabricators
Q: Will my drawing be safe after you get it?
A: Yes, we can sign a non-disclosure agreement.
metal sheet fabrication    fabricated stainless steel cones
If you have another question, pls feel free to contact us as below:
sus304 sheet bendibg   metall konus    sheet metal cone rolling
CONTACT US

APP
Post My RFQ
WhatsApp
+86-17326049340