Products
Modern White Shoe Bench Shoe Rack Shoe Cabinet Hallway Storage Bench with Seat Cushion
Modern White Shoe Bench Shoe Rack Shoe Cabinet Hallway Storage Bench with Seat Cushion
Modern White Shoe Bench Shoe Rack Shoe Cabinet Hallway Storage Bench with Seat Cushion
Modern White Shoe Bench Shoe Rack Shoe Cabinet Hallway Storage Bench with Seat Cushion

Modern White Shoe Bench Shoe Rack Shoe Cabinet Hallway Storage Bench with Seat Cushion

FOB Reference Price: Get Latest Price
≥120 Cartons
US $13.82
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Material:
MDF
Place of Origin:
Jiangsu, China
Brand Name:
OUBONA
Model Number:
HXD0055K03N729
Product name:
Shoe changing stool
Usage:
Living Room Funiture
Color:
White
Style:
Modern-Style
Packing:
1pc/ctn
PAYMENT TERM:
T/T 30%/70%

Quick Details

Feature:
Other
Application:
Home Office, Living Room, Hotel, Mall, Other
Design Style:
Modern
Material:
MDF
Place of Origin:
Jiangsu, China
Brand Name:
OUBONA
Model Number:
HXD0055K03N729
Product name:
Shoe changing stool
Usage:
Living Room Funiture
Color:
White
Style:
Modern-Style
Packing:
1pc/ctn
PAYMENT TERM:
T/T 30%/70%

Q: Are you a manufacturer or a trading company?

A:Yes, we are a professional manufacturer for Home Furnishing with 10 years experience.

Q: How can you guarantee your final quality?

A: As for quality control, we’ve approved four testing procedures:

Initial inspection, re-inspection, final inspection and sampling inspection.

Q: What kind of Certification did you pass?

A: The material can be provided with E0 level and E1 related certificates through the professional assessment of relevant institutions.

Q:What is the advantage of your company?

A: Our materials are of high quality, healthy environment, high cost performance and diverse design styles.

Q:Can you customize it according to our request?

A:Of course. We can do customized according to your special requirement and you need to provide us some technical data such as dimension and drawing.

Q:How long is the production lead time?

A:8 to 30 days is always to be required for an official order while after receiving 30% deposit and the relevant final confirmed details completely.

Q: How is the MOQ of required?

A: We welcome any amount under your requested. but a competitive price is always depends on the quantity increase gradually

APP
Post My RFQ
WhatsApp
+86-17326049340