-
Reduced costs:
because the equipment is rentable, it does not need to be pre-financed.
-
Modular:
Its modular components help it adapt flexibly to different geometries.
-
Safety:
the CFT's anchorages are hydraulically test-loaded before every pour.
- Product Details
- {{item.text}}
Quick Details
-
Application:
-
Warehouse
-
Design Style:
-
Modern
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
BOYOUN
-
Model Number:
-
Formwork System
-
Material:
-
Steel
-
Type:
-
Recyclable
-
Usage:
-
Concrete Construction Support
-
Size:
-
Non-standard:custom-made
-
Certificate:
-
ISO9001
-
Product name:
-
Steel Concrete Column Formwork
-
Color:
-
Blue
-
Thickness:
-
according to design
-
Packing:
-
Standard Sea-transport Packing
Quick Details
-
Warranty:
-
1 Year
-
After-sale Service:
-
Online technical support, Onsite Training
-
Project Solution Capability:
-
3D model design, total solution for projects
-
Application:
-
Warehouse
-
Design Style:
-
Modern
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
BOYOUN
-
Model Number:
-
Formwork System
-
Material:
-
Steel
-
Type:
-
Recyclable
-
Usage:
-
Concrete Construction Support
-
Size:
-
Non-standard:custom-made
-
Certificate:
-
ISO9001
-
Product name:
-
Steel Concrete Column Formwork
-
Color:
-
Blue
-
Thickness:
-
according to design
-
Packing:
-
Standard Sea-transport Packing
Cantilever forming traveler
Cantilever forming traveler (Yellow River bridge project)
Cantilever forming traveler is widely used for the construction cast-in-site and balanced cantilever bridges.CFT can be customized to satisfy clients's requirement.
According to the structure, they can be classified as truss traveler (including rhombic, triangular, bow-string etc.), cable stayed traveler (including triangular and pre-stressed), profile steel traveler and hybrid traveler.
CFT design principles:
- light weight;
- simple, strong and stable structure;
- moved, mounted and stripped easily;
- strong reusability;
- small deformation under force;
- adequate space under traveler and providing a big space for bars and formwork construction operation.
Online customer service
Mon-Fri: (other time please reserve)
08:30 - 12:00 (Beijing time)
13:00 - 17:00 (Beijing time)
All-in-one solution
Professional solution for each project
Prompt offer with competitive price
Process every unique project for client
Formwork instructors
The Boyoun formwork instructors are specially trained and experienced practitioners who know how to install
Painting workshop
Formwork being to paint workshop
Welding
1. Where is your factory?
Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 240km far from Tianjin port. Our sales office is located in Beijing city.
2. How fast can my order be delivered?
You can state your desired Delivery date for your order. The order and the desired delivery date will be checked after your order got sent.
When you receive your order confirmation, you will find the information on your final delivery date (outgoing). We will, of course, try our best to meet the specified delivery date.
3. What's the material of your products?
Steel Q235B or Q355B.