- Product Details
- {{item.text}}
Quick Details
-
Color:
-
Orange, Orange
-
Product name:
-
Automobile combustion chamber carbon deposition pulse cleaning machine
-
Application:
-
Automobile combustion chamber
-
Relative temperature:
-
< 85%
-
maximum power:
-
1100W
-
Filtration accuracy:
-
60MU
-
pulse tube length:
-
2M
-
Working voltage:
-
220V
-
Filter cup capacity:
-
800ML
-
Working pressure:
-
< 2GK
Quick Details
-
Place of Origin:
-
Guangdong, China
-
Brand Name:
-
DNC
-
Model Number:
-
B22
-
Color:
-
Orange, Orange
-
Product name:
-
Automobile combustion chamber carbon deposition pulse cleaning machine
-
Application:
-
Automobile combustion chamber
-
Relative temperature:
-
< 85%
-
maximum power:
-
1100W
-
Filtration accuracy:
-
60MU
-
pulse tube length:
-
2M
-
Working voltage:
-
220V
-
Filter cup capacity:
-
800ML
-
Working pressure:
-
< 2GK
B22 Combustion chamber carbon deposition cleaning machine
Specification:
Product name | Constant temperature high frequency pulse carbon crusher | Pressure gage | 0-8kg |
Relative temperature | < 85% | stainless steel tube | 400MM |
maximum power | 1100W | Filtration accuracy | 60MU |
pulse tube length | 2M | Noise | < 70db |
Working pressure | < 2GK | maximum constant temperature | 85℃ |
Filter cup capacity | 800ML | Product size | 1170*420*450mm |
Working voltage | Working voltage | Material | Iron |
Operation instructions
1,
heated hot car, cold car can be ignored. A hot car works better.
2.
Confirm that the cleaning vehicle is in the braking state, open the hood and install the leaf plate.
3.
After disassembling the spark plug, put it into a 250ML measuring cup and pour proper amount of cleaning agent for soaking.
4.
Adjust the pistons of all cylinders to the same height, check the carbon deposition in the cylinders with an endoscope, and take photos for the comparison before and after cleaning.
5.
Pour the cleaning solution into four cylinders, 200-250ML for each cylinder
6.
Connect the equipment to 220V power supply and air source. Insert the pulse tube into the cylinder (to the end).
7,
turn on the equipment power switch heating switch, observe the heating indicator light on, after reaching the heating temperature value automatically off, (heating process does not affect the construction) pressure to 1 pressure, click the operating plate automatic button equipment will keep the cleaning liquid out, play in, in this process if there is a liquid splash out to cover the pipe mouth with a towel.
After the cleaning is completed, click the recovery button to recover the liquid in the cylinder. After the recovery is completed, turn off the handle switch, click the drain button, and turn on the handle switch to discharge the liquid
(in this step, prepare the drain container first, open the handle switch, and then click the drain button).
8,
the cycle cleaning generally lasts 20 minutes, remember to close the heating switch after the completion of construction to avoid heating system damage affect the service life.
9,
the completion of pumping, must use the air gun to dry the cylinder.
10,
cleaning is complete, must be replaced with a new oil.