Products
Laminated  Aluminum Scaffold Plank With Trapdoor
Laminated  Aluminum Scaffold Plank With Trapdoor
Laminated  Aluminum Scaffold Plank With Trapdoor
Laminated  Aluminum Scaffold Plank With Trapdoor
Laminated  Aluminum Scaffold Plank With Trapdoor
Laminated  Aluminum Scaffold Plank With Trapdoor
Laminated  Aluminum Scaffold Plank With Trapdoor
Laminated  Aluminum Scaffold Plank With Trapdoor

Laminated Aluminum Scaffold Plank With Trapdoor

FOB Reference Price: Get Latest Price
≥50 Pieces
US $130
≥120 Pieces
US $100
Free Inquiry
Customized Request
  • Product Details
  • {{item.text}}

Quick Details

Type:
scaffolding ladder
Place of Origin:
Jiangsu
Brand Name:
Qiancang
Model Number:
JSRHT-2570
Product Name:
Laminated Aluminum Scaffold Plank With Trapdoor
Material:
Aluminum Plywood
Width:
610/620mm
Length:
2570mm
MOQ:
50 PCS
Certificate:
ISO 9001 2008;SGS
Surface treatment:
aluminum and plywood
Packing:
Steel Pallet
Application:
is used for the construction to provide the working platform

Quick Details

Warranty:
1 Year
After-sale Service:
Online technical support
Project Solution Capability:
graphic design
Type:
scaffolding ladder
Place of Origin:
Jiangsu
Brand Name:
Qiancang
Model Number:
JSRHT-2570
Product Name:
Laminated Aluminum Scaffold Plank With Trapdoor
Material:
Aluminum Plywood
Width:
610/620mm
Length:
2570mm
MOQ:
50 PCS
Certificate:
ISO 9001 2008;SGS
Surface treatment:
aluminum and plywood
Packing:
Steel Pallet
Application:
is used for the construction to provide the working platform
Product Description

Laminated Aluminum Scaffold Plank With Trapdoor

Item No.
Length
Width
JSRHT-1570
1570mm
610/620mm
JSRHT-2070
2070mm
610/620mm
JSRHT-2570
2570mm
610/620mm
JSRHT-3070
3070mm
610/620mm
Related Products
Our Company

Nanjing Jinsong Machine Casting Co.,Ltd,we are a factory,it is Founded in the year 1997,since year 2010 as a manufacturer of scaffolding and formwork in China.We are located in Nanjing city,centred around Shanghai in the Yangtze delta economic circle.We have facilities covering a total area of 23000 square meters,our employees reach up to 80 staffs,including 5 people of management team,3 engineers,6 quality control(QC),advanced testing laboratory and workers,our annual production reach 5 million lbs of products.

By the principle of "Technology Innovation",we are dedicated to design and produce all kinds of scaffolding products.Our main products include:Ringlock scaffolding system,Cuplock scaffolding system,Kwikstage scaffolding system,Haki scaffolding system,Frame scaffolding system and Steel prop system,which is widely used in major residential,commercial and industrial projects at home and abroad.

We are committed to designing optimal program,high quality products and outstanding service after sales based on satisfaction from customers,considering from the customers' perspective,we strive to create more value for them.


For further information about our scaffold,please contact us by e-mail or call,you will be glad you did.

Certifications
Packing & Delivery

Packing

Bundles;Steel Pallet or According to Customers' Request

Delivery

Some of the products are in stock at our warehouse, generally we need 5-10 days to redo the surface coating and packaging before the delivery. Regarding to the non-stock products, the lead time 30 days depends on your requirement on the product. We will suggest you the fastest shipping method to you if you need the products urgently.
Ship by sea or according to your need.

Our Exihibition

Canton Fair
We have attented the Canton Fair for more than 10 years.From 2005 year until now.
And we will continue to attending,expecting meeting you.

The photo of 2010 Canton Fair

The photo Of 2015 Canton Fair


The photo of 2018 Canton Fair


FAQ

1.What can you get from us?
Since we are direct manufactory for Scaffolding System, you can be assured that we can offer good quality with good price. We believe that Whole-hearted production,credit business,continuous improvement,sincere service.
We provide OEM ODM and customized design services.

2.How long is the delivery time?
Some of the products are in stock at our warehouse, generally we need 7~10 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time 10~35 days depends on your requirement on the product. We will suggest you the fastest shipping method to you if you need the products urgently.

APP
Post My RFQ
WhatsApp
+86-17326049340