Produce metal parts with complicated structure
- Product Details
- {{item.text}}
Quick Details
-
Material:
-
Copper aluminum steel stainless steel titanium
-
Product name:
-
Forging Metal Parts
-
MOQ:
-
10 Piece
-
Keyword:
-
OEM Hot Forging Parts
-
Application:
-
Industry
-
Surface treatment:
-
Polishing
-
Service:
-
OEM\ODM
-
Process:
-
Forging+Machining(if Need)+surface Treatment
-
Certificate:
-
ISO9001
-
Size:
-
Customer's Requst
Quick Details
-
Place of Origin:
-
Shandong, China
-
Brand Name:
-
Meide
-
Model Number:
-
customization
-
Material:
-
Copper aluminum steel stainless steel titanium
-
Product name:
-
Forging Metal Parts
-
MOQ:
-
10 Piece
-
Keyword:
-
OEM Hot Forging Parts
-
Application:
-
Industry
-
Surface treatment:
-
Polishing
-
Service:
-
OEM\ODM
-
Process:
-
Forging+Machining(if Need)+surface Treatment
-
Certificate:
-
ISO9001
-
Size:
-
Customer's Requst
Technical Support
Our engineers are skilled at AUTO CAD, PRO ENGINEER, SOLID WORKS and other 2D & 3D softwares. We are able to design, develop,produce and deliver your PO according to your drawings, samples or just an idea. Dural control of standard products and OEM products.
Quality Control
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have full inspection and routing inspection during mass production---In process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(OQC)
Product Paramenters
Available Material:
|
Carbon steel alloy steel, etc
|
Heat Treatment:
|
Annealing,Quenching,Nitriding,Hardening,Tempering,Normalizing,etc.
|
Tolerance:
|
As per drawing.(+/-0.05mm,+/-0.01mm)
|
Surface Treatment:
|
Zinc-Plated,Nickel-Plated,Chrome-Plated,Anodize,Phosphating,Chemical Blackening,Salt Bath Nitriding,etc.
|
Lead Time:
|
20-45Days Depends On Quantities and complexity
|
Application:
|
Forklift,Crane,Train,Truck,Lawnmower,Rail Road Euipment,medical device, industrial machine, automobile, electric
appliance,Automation machine,other industries,etc, |
Payment Term:
|
L/C at sightT/T 30% deposit and balanced 70% to pay before shipment.
|
Port Of Loading:
|
Shanghai or Ningbo,etc.
|
Production Equipment:
|
CNC Machining center,CNC Lathe,Grinding Machine,Milling Machine,Sawing Machine,Welding Machine,Hydraulic Press Machine,Drilling
and Tapping Machine,Gear Shaping Machine,etc. |
Inspection Equipment:
|
Electronic Penumatic Measuring Instrument,Three Coodinate Detection Equipment,Rockwell Hardness Tester,Digital Ultrasonic Flaw
Detector,Surface Roughness Measuring Instrument,Leeb Hardness Tester,Cladding Measuring Instrument,Salt Spraying Tester,Gear Measurement Center,etc. |
QC:
|
1.Incoming material will be checked before production.2.Strict processing quality control.
3.100% inspection before shipment. 4.We are responsible for product quality to the end user. |
Package:
|
Method 1:Carton box or corrugated carton
Method 2:Wooden case or wooden crate Method 3: Iron basket or plastic basket Method 4: Pallet |
After-sales Service:
|
We will follow up goods for customers and help to solve problems after sales.
|
Product Description
DIMENSION
Dimensional accuracy are high, iso 8062-3-2007 CT4-6 Grade.Save metal material and mechanical processing cost.
APPEARANCE
No porosity, shrinkage cavity, burr and etc.
Surface roughness: Ra1.6-3.2
Grey iron,Ductileiron,Steel,Alloy steel,Stainlesssteel,Aluminumalloy,Carbonsteel,Titanium alloy and etc.
SHORT LEAD TIME
From design, mold, casting, processing, surface treatment, packaging delivery one-stop
Product material
Carbon Steel
|
A350LF2、 A105、Q235、Q355D、A694F52、A516-GR65、EN10222、P280GH、P245GH、P250GH、JIS S25C、SS400、S20C、16Mn、C22.8、Q345B/C/D、1055、1045、C50、C45、10#、20#、35#、45#、40#、50#、60#
|
Alloy Steel
|
42CrMo、A182F1、F5、F9、F11、F91、F92、F22、12Cr2Mo1、10Cr9Mo1VNbN(F91)、10Cr9MoW2VNbBN(F92)、JB4726-2000、15CrMo、JB4726-2000、12CrMoV、35CrMo、4140、4340、4330、4130、4150、9CR2MO、17NiCrMo6-4、18CrNiMo7-6、20MnMo、25CRMO、20CRMO、20CRMOTI、30CrNiMo8、34CRNIMO、34CrNiMo6、36CrNiMo4、34CrNi3Mo、34CrMo1、40CRNIMO、40CrNiMoA、50CrMo4、Q345D、300M、17-4PH、PH13-8Mo、15-5PH、AerMet100
|
Workmanship Process
Manufacturing capacity covers the entire production process of forging parts, from mold design and manufacturing, forging, secondary processing, heat treatment, surface treatment to finishing, to provide customers with ready-to-use products and services.
About us
Shandong Meide Import And Export Co., Ltd.
focuses on the production and sales of forging, Shaped tubing, seamless tube, alloy steel, steel processing general machinery and equipment. The company has passed
IS09001:2000
quality system certification,
SGS, ROSH, TUV, REACH
and other certifications. We can customize and develop new products according to customers' actual application, and provide products with different cost performance and performance requirements.
Factory Equipment
Packaging and Transportation
|
1) 0-100kg: express & air freight priority
|
|
2) >100kg: sea freight priority
|
|
3) As per customized specifications
|
|
All parts are custom made according to customer's drawings or samples, no stock.
|
Certifications
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are an industrial and trading company with our own iron foundry and many outsourcing partners.
Q2: What is your lead time?
A: Approximately 15-35 days from the date of order.
Q3: Do you provide samples? Is it free or extra?
A: We can provide samples. If it's not too much, it's free. However, if we need to make the mold first, we need to charge 50% of the mold cost.
Q4: What are your payment terms?
1) Mold fee: 50% in advance, 50% after sample approval
2) Goods: 30% down payment, 70% should be received before delivery.
A: We are an industrial and trading company with our own iron foundry and many outsourcing partners.
Q2: What is your lead time?
A: Approximately 15-35 days from the date of order.
Q3: Do you provide samples? Is it free or extra?
A: We can provide samples. If it's not too much, it's free. However, if we need to make the mold first, we need to charge 50% of the mold cost.
Q4: What are your payment terms?
1) Mold fee: 50% in advance, 50% after sample approval
2) Goods: 30% down payment, 70% should be received before delivery.
Hot Searches