- Product Details
- {{item.text}}
Quick Details
-
Volatile Matter (%):
-
65
-
Place of Origin:
-
Hebei, China
-
Calory (J):
-
7100
-
Ash Content (%):
-
0.03
-
Moisture (%):
-
0.3
-
Abrasive Resistance:
-
STRONG
-
Crushing Strength:
-
90
-
Brand Name:
-
SUOYANG
-
Model Number:
-
SY-C14
-
Product Name:
-
Petroleum Asphalt
-
Application:
-
Roads
-
Applicattion 2:
-
Road Patch
-
Applicattion 3:
-
A bridge across a river
Quick Details
-
Sulphur Content (%):
-
1.5
-
Fixed Carbon (%):
-
0.8
-
Phosphorus Content (%):
-
0.1
-
Volatile Matter (%):
-
65
-
Place of Origin:
-
Hebei, China
-
Calory (J):
-
7100
-
Ash Content (%):
-
0.03
-
Moisture (%):
-
0.3
-
Abrasive Resistance:
-
STRONG
-
Crushing Strength:
-
90
-
Brand Name:
-
SUOYANG
-
Model Number:
-
SY-C14
-
Product Name:
-
Petroleum Asphalt
-
Application:
-
Roads
-
Applicattion 2:
-
Road Patch
-
Applicattion 3:
-
A bridge across a river
Product Description



1.Construction Technology
Pothole Cleaning
Clean up the gravel and waste residue in and around the pit to be repaired. There should be no mud, ice cubes and other debris in the pit. The pit to be repaired should have neatly cut edges, and solids should be seen in the removal of waste residue. until the firm side.
Brush interface edge sealer
Pothole Cleaning
Clean up the gravel and waste residue in and around the pit to be repaired. There should be no mud, ice cubes and other debris in the pit. The pit to be repaired should have neatly cut edges, and solids should be seen in the removal of waste residue. until the firm side.
Brush interface edge sealer
Evenly brush the interface agent on the facade and bottom of the cleaned pit, especially around the pit and the corners of the pit, and evenly.Fill the Pit After opening the bag, fill enough asphalt cold patch material into the pothole until the filler is about 1.5cm higher than the road surface. After filling, the center of the pothole should be slightly higher than the surrounding road surface and be curved.If the depth of the road pothole is greater than 5cm When filling, it should be filled in layers and compacted layer by layer, and each layer should be 3-5cm. Compaction After laying evenly, according to the field environment, the size and depth of the repaired area, select appropriate compaction tools and methods for compaction. Such as human compaction, vibrating plate compactor, and road roller compaction. When repairing
high-grade and high-traffic highways, the surrounding areas and corners of the repaired area should be fully compacted, and there must be no shortage of materials and virtual paving. Otherwise, looseness and water seepage may occur due to insufficient compaction. Open to Traffic After compaction, it can be directly opened to traffic.
2.Ordinary asphalt cold patch
Long time to fully cure: 5-7 days
Validity: 2 years
The formula should be used seasonally
3.Execution Standard Report
Execution Standard: JT/T-2015
(National Standard for Testing Asphalt Cold Feed Finished Products)
ItemTechnical RequestResultJudgmentAdhesion grade5°5°PassPenetration strength (kg/cm2) 0.5 42.5PassStability(kN)≥35.2PassResidual stability≥8587Pass
We testify that the chemical analysis shown hereunder for these goods have been duly tested by us and we confirm that the goods are in compliance with approved national standards.
high-grade and high-traffic highways, the surrounding areas and corners of the repaired area should be fully compacted, and there must be no shortage of materials and virtual paving. Otherwise, looseness and water seepage may occur due to insufficient compaction. Open to Traffic After compaction, it can be directly opened to traffic.
2.Ordinary asphalt cold patch
Long time to fully cure: 5-7 days
Validity: 2 years
The formula should be used seasonally
3.Execution Standard Report
Execution Standard: JT/T-2015
(National Standard for Testing Asphalt Cold Feed Finished Products)
ItemTechnical RequestResultJudgmentAdhesion grade5°5°PassPenetration strength (kg/cm2) 0.5 42.5PassStability(kN)≥35.2PassResidual stability≥8587Pass
We testify that the chemical analysis shown hereunder for these goods have been duly tested by us and we confirm that the goods are in compliance with approved national standards.
Application Range

Used in asphalt concrete road, cement concrete road, parking lot, airport runway, etc
Package and delivery
Packaging Details: 1.jumbo ton bag 2. 50kg pp bag in ton bag 3. in bulk or loose inside container 4. as the customers' requirements
Hot Searches